EUVIMEDEUVIMED entdecken
Open Access · CC BY-SA 4.0

Machine Learning–Driven Prediction of Construction Project Delays Using Multi-Factor Risk Indicators in Infrastructure Development

Joseflim Marchel, Budi Hartono, Agustinus Budi Santoso

Jurnal Rekayasa Sipil dan Arsitektur · 2026

DOI: 10.51903/g8dtmg04 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Jurnal Rekayasa Sipil dan Arsitektur, 2026. Verfasst von Joseflim Marchel und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Construction project delays represent a complex issue driven by multiple interacting risk factors, making them difficult to predict using traditional approaches. This study develops a machine learning–based prediction model by incorporating various risk indicators related to cost, schedule, quality, and operational conditions. Historical project data are used to train multiple algorithms, including Decision Tree, Random Forest, and Support Vector Machine, which are evaluated using classification performance metrics. The results demonstrate that the Random Forest model achieves the highest accuracy among the tested algorithms. Feature importance analysis reveals that work progress deviation and payment delays are the most influential factors contributing to project delays. The proposed approach not only improves predictive performance but also enhances the understanding of critical risk drivers, enabling more proactive decision-making in construction project management.

Zitieren

APA

Marchel, J., Hartono, B., & Santoso, A. B. (2026). Machine Learning–Driven Prediction of Construction Project Delays Using Multi-Factor Risk Indicators in Infrastructure Development. Jurnal Rekayasa Sipil dan Arsitektur. https://doi.org/10.51903/g8dtmg04

Vancouver

Marchel J, Hartono B, Santoso AB. Machine Learning–Driven Prediction of Construction Project Delays Using Multi-Factor Risk Indicators in Infrastructure Development. Jurnal Rekayasa Sipil dan Arsitektur. 2026. doi:10.51903/g8dtmg04

BibTeX
@article{Marchel2026,
  author = {Marchel, Joseflim and Hartono, Budi and Santoso, Agustinus Budi},
  title = {Machine Learning–Driven Prediction of Construction Project Delays Using Multi-Factor Risk Indicators in Infrastructure Development},
  journal = {Jurnal Rekayasa Sipil dan Arsitektur},
  year = {2026},
  doi = {10.51903/g8dtmg04}
}
Kostenlos starten →