Delivery of road construction projects in Kenya: A review of causes, trends, and research gaps

Edwin Kipkemoi Cheserek, Alexander Khaemba, Samuel Waweru, Janet Oyaro, Edwin Kimutai Kanda

SCIENCE MUNDI · 16.10.2026 · 6 (2) · 445-455

DOI: 10.51867/scimundi.6.2.36 ↗

Kurz gefasst

Fachartikel in der Zeitschrift SCIENCE MUNDI, online erschienen am 16.10.2026. Verfasst von Edwin Kipkemoi Cheserek und 4 weiteren Autor:innen. Die Arbeit nennt 27 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY-NC 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Construction projects in Kenya continue to experience delays and there is no noted improvement in the completion of road construction projects in the recent past. This has been worsened by the fact that some projects are started for political reasons leading to poor planning and skewed resource allocation. Delays in project completion have continued to cost tax payers millions of shillings with no tangible solution on sight necessitating this review. Therefore, this review synthesizes studies on construction project delivery in Kenya, revealing persistent delays affecting 35–73% of projects with no improvement over time. It was guided by the triple constraints theory, systems theory, resource-based view theory and institutional theory. Contractor-related factors such as cash flow constraints, poor scheduling, and inadequate site management are the dominant delay causes, followed by client factors which included delayed payments and bureaucracy. Consultant factors such as design deficiencies, slow responses, and external factors which include price escalations, weather, and wayleave disputes are other significant causes of delay in project delivery. A causal domino effect is identified whereby client payment delays trigger contractor liquidity crises and work stoppages. This review makes three important contributions: establishing delay persistence, mapping causal chains, and identifying critical research gaps such as the absence of project duration prediction models for Kenya and undetermined effects of site meetings, personnel capacity, and variations on delays. Based on this review, the following interventions are desirable: improved contractor vetting, assured client funding, enhanced supervision, and development of empirically validated duration prediction models tailored to Kenya.

Zitieren

APA

Cheserek, E. K., Khaemba, A., Waweru, S., Oyaro, J., & Kanda, E. K. (2026). Delivery of road construction projects in Kenya: A review of causes, trends, and research gaps. SCIENCE MUNDI, 6(2), 445-455. https://doi.org/10.51867/scimundi.6.2.36

Vancouver

Cheserek EK, Khaemba A, Waweru S, Oyaro J, Kanda EK. Delivery of road construction projects in Kenya: A review of causes, trends, and research gaps. SCIENCE MUNDI. 2026;6(2):445-455. doi:10.51867/scimundi.6.2.36

BibTeX
@article{Cheserek2026,
  author = {Cheserek, Edwin Kipkemoi and Khaemba, Alexander and Waweru, Samuel and Oyaro, Janet and Kanda, Edwin Kimutai},
  title = {Delivery of road construction projects in Kenya: A review of causes, trends, and research gaps},
  journal = {SCIENCE MUNDI},
  year = {2026},
  volume = {6},
  number = {2},
  pages = {445--455},
  doi = {10.51867/scimundi.6.2.36}
}
Kostenlos starten →