EUVIMEDEUVIMED entdecken
Open Access · CC BY-SA 4.0

Owner Capability as a Precondition for Collaborative Contracting: A Critical Realist Explanation of Alliance Contract Failure in a Petrochemical Megaproject

Antonius Prasetya

Jurnal Manajemen dan Bisnis Madani · 2026

DOI: 10.51353/bs6q9d65 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Jurnal Manajemen dan Bisnis Madani, 2026. Verfasst von Antonius Prasetya. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Alliance contracts are adopted in megaprojects to replace adversarial exchange with shared risk, shared reward and joint decision-making, yet many alliances appear to drift back towards the transactional patterns they were meant to overcome. This article offers a tentative explanation through a petrochemical megaproject in Malaysia whose alliance was converted to a lump-sum contract after severe delay. Adopting critical realism, the study analyses eleven semi-structured interviews with managerial and operational tier-1 contractor staff, supported by project documents, and applies retroductive reasoning to move from experienced events towards possible generative mechanisms. Four candidate mechanisms are suggested: governance constraints on alliance steering, accountability-driven caution under the target-cost model, a gradual erosion of relational trust, and the decoupling of the collaborative contract from daily routines. Front-end cost uncertainty, which surfaced as a gap between the sanctioned estimate and market quotations, seems to have activated these mechanisms. The findings tentatively suggest that owner capability, embedded in supportive project and corporate governance, may be a precondition for, rather than an outcome of, collaborative contracting, and that collaboration may need to be enacted in everyday routines rather than declared in the contract title.Keywords: megaprojects, owner capability, project alliancing, project governance, relational contracting

Zitieren

APA

Prasetya, A. (2026). Owner Capability as a Precondition for Collaborative Contracting: A Critical Realist Explanation of Alliance Contract Failure in a Petrochemical Megaproject. Jurnal Manajemen dan Bisnis Madani. https://doi.org/10.51353/bs6q9d65

Vancouver

Prasetya A. Owner Capability as a Precondition for Collaborative Contracting: A Critical Realist Explanation of Alliance Contract Failure in a Petrochemical Megaproject. Jurnal Manajemen dan Bisnis Madani. 2026. doi:10.51353/bs6q9d65

BibTeX
@article{Prasetya2026,
  author = {Prasetya, Antonius},
  title = {Owner Capability as a Precondition for Collaborative Contracting: A Critical Realist Explanation of Alliance Contract Failure in a Petrochemical Megaproject},
  journal = {Jurnal Manajemen dan Bisnis Madani},
  year = {2026},
  doi = {10.51353/bs6q9d65}
}
Kostenlos starten →