EUVIMEDEUVIMED entdecken
Open Access · CC BY-SA 4.0

Evaluation Of Implementation Strategies And Methods To Improve Efficiency In The Bagong Main Dam Project Trenggalek

Moch. Khamim, Mohamad Zenurianto, Raden Ajeng Mariyana, Roland Gasenda Suryaningrat

Asian Journal Science and Engineering · 31.12.2025 · 4 (2) · 148-160

DOI: 10.51278/ajse.v4i2.2030 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Asian Journal Science and Engineering, online erschienen am 31.12.2025. Verfasst von Moch. Khamim und 3 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Earthfill dam construction requires effective strategies to ensure structural safety, construction quality, and efficient use of time and resources. This study examines the construction strategy and implementation method of the Main Dam of the Bagong Dam Project, Indonesia, which is designed as a vertically zoned earthfill embankment with a length of 620 m, a crest width of 12 m, a crest elevation of +330 m, and a height of 82 m. The research focuses on the application of a zoning-based construction approach to improve construction efficiency under complex field condition. The results indicate that dividing the embankment into six functional zones enables systematic layer-by-layer construction and parallel work execution, resulting in a planned construction duration of 937 working days. The integration of material zoning, quality control procedures, and optimized equipment management ensured that all embankment layers achieved more than 95% of maximum dry density. Coordinated equipment utilization further improved productivity, allowing approximately 304,653 m³ of embankment work to be completed within 53 working days during critical construction stages. In addition, the implementation of a structured safety management system supported the achievement of zero-accident construction performance. These findings demonstrate that the integration of zoning strategy, systematic construction sequencing, quality management, equipment planning, and safety control significantly enhances time and cost efficiency while maintaining construction quality. The proposed approach provides a practical framework for earthfill dam construction projects in Indonesia and other regions with similar geological and climatic conditions.

Zitieren

APA

Khamim, M., Zenurianto, M., Mariyana, R. A., & Suryaningrat, R. G. (2025). Evaluation Of Implementation Strategies And Methods To Improve Efficiency In The Bagong Main Dam Project Trenggalek. Asian Journal Science and Engineering, 4(2), 148-160. https://doi.org/10.51278/ajse.v4i2.2030

Vancouver

Khamim M, Zenurianto M, Mariyana RA, Suryaningrat RG. Evaluation Of Implementation Strategies And Methods To Improve Efficiency In The Bagong Main Dam Project Trenggalek. Asian Journal Science and Engineering. 2025;4(2):148-160. doi:10.51278/ajse.v4i2.2030

BibTeX
@article{Khamim2025,
  author = {Khamim, Moch. and Zenurianto, Mohamad and Mariyana, Raden Ajeng and Suryaningrat, Roland Gasenda},
  title = {Evaluation Of Implementation Strategies And Methods To Improve Efficiency In The Bagong Main Dam Project Trenggalek},
  journal = {Asian Journal Science and Engineering},
  year = {2025},
  volume = {4},
  number = {2},
  pages = {148--160},
  doi = {10.51278/ajse.v4i2.2030}
}
Kostenlos starten →