Investigating Project Portfolio Management Adoption in Iraqi Construction Projects: An Analysis of Perceived Benefits and Challenges

Majid Hameed Yahya, Kadhim R. Erzaij

Engineering, Technology & Applied Science Research · 06.06.2026 · 16 (3) · 35071-35076

DOI: 10.48084/etasr.17923 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Engineering, Technology & Applied Science Research, online erschienen am 06.06.2026. Verfasst von Majid Hameed Yahya und 1 weiteren Autor:innen. Die Arbeit nennt 22 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Project Portfolio Management (PPM) is becoming increasingly relevant to Iraqi construction organizations that manage multiple typical and repetitive projects under budget, schedule, and governance constraints. This study investigates whether the perceived benefits and implementation challenges of PPM vary according to the organizations' current multi-project management level and whether standardized Typical Project Management (TPM) practices can serve as a practical foundation for portfolio governance. A structured 14-item questionnaire covering seven potential benefits and seven potential challenges was developed from the literature and refined through expert review for contextual suitability. Data collected from 102 Iraqi construction professionals were analyzed using descriptive statistics, weighted contingency tables, Pearson's chi-square tests, and Cramer's V. The results show statistically significant associations between management level and the dominant perceived benefit category (χ² = 26.503, df = 12, p = 0.009, V = 0.271) and between management level and the dominant perceived challenge category (χ² = 28.290, df = 12, p = 0.005, V = 0.280). Organizations operating at the portfolio-management level place stronger emphasis on alignment, prioritization, and governance-oriented value, whereas organizations with lower levels of maturity tend to emphasize commitment, coordination, and difficulties associated with prioritization methods. The study provides a compact context-sensitive instrument and practical insights into how adoption priorities shift across management levels in Iraqi construction organizations. Due to the cross-sectional nature of the study, the results indicate association rather than causation.

Zitieren

APA

Yahya, M. H., & Erzaij, K. R. (2026). Investigating Project Portfolio Management Adoption in Iraqi Construction Projects: An Analysis of Perceived Benefits and Challenges. Engineering, Technology & Applied Science Research, 16(3), 35071-35076. https://doi.org/10.48084/etasr.17923

Vancouver

Yahya MH, Erzaij KR. Investigating Project Portfolio Management Adoption in Iraqi Construction Projects: An Analysis of Perceived Benefits and Challenges. Engineering, Technology & Applied Science Research. 2026;16(3):35071-35076. doi:10.48084/etasr.17923

BibTeX
@article{Yahya2026,
  author = {Yahya, Majid Hameed and Erzaij, Kadhim R.},
  title = {Investigating Project Portfolio Management Adoption in Iraqi Construction Projects: An Analysis of Perceived Benefits and Challenges},
  journal = {Engineering, Technology & Applied Science Research},
  year = {2026},
  volume = {16},
  number = {3},
  pages = {35071--35076},
  doi = {10.48084/etasr.17923}
}
Kostenlos starten →