Project Management Competency and Road Construction Project Completion in Selected Counties in Kenya

Benjamin Muikiio Mwendwa, Agnes Kirinyet

Journal of Entrepreneurship and Project Management · 20.11.2026 · 11 (7) · 1-24

DOI: 10.47941/jepm.4120 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Entrepreneurship and Project Management, online erschienen am 20.11.2026. Verfasst von Benjamin Muikiio Mwendwa und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Purpose

The study sought to establish the relationship between project management competency and road construction project completion in selected counties in Kenya. The specific project management competency that were focused in the study comprised of leadership competency, communication competency, risk management competency and technical management competency. Methodology: The study targeted 52 road construction projects in three counties comprising of Kitui, Machakos and Nairobi City County. The units of observation comprised of project managers, risk managers, road engineers, road technicians, government representatives, contractors, and local community leaders. A total of 213 respondents were targeted. The study relied on primary data which was gathered through 5-point Likert scale questionnaires. Data was analyzed through both inferential and descriptive statistics. The study employed MS Excel and Statistical Package for Social Scientists to analyze the data. The results of the study were displayed in form of tables and figures. Prior data collection, a pilot study was conducted to assess the reliability and validity of the questionnaires.

Findings

The study established that project management competency positively and significantly related with road construction project completion in selected counties in Kenya. Specifically, leadership competency, communication competency, risk management competency and technical management competency had a positive and significant relationship with road construction project completion. This was depicted by beta values of 0.241, 0.127, 0.204 and 0.334 and significant values of 0.000, 0.003, 0.000 and 0.000 respectively. The study concluded that leadership, communication, risk management, and technical management competencies have positive and significant relationships with road construction project completion in selected counties in Kenya. Unique Contribution to Theory, Policy and Practice: Based on the findings, the study recommends that telecommunication companies in KenyThe study recommended that county governments and road project managers strengthen these competencies through enhanced leadership practices, effective communication systems, systematic risk response mechanisms, and improved technical planning, resource management, cost control, and project monitoring.

Zitieren

APA

Mwendwa, B. M., & Kirinyet, A. (2026). Project Management Competency and Road Construction Project Completion in Selected Counties in Kenya. Journal of Entrepreneurship and Project Management, 11(7), 1-24. https://doi.org/10.47941/jepm.4120

Vancouver

Mwendwa BM, Kirinyet A. Project Management Competency and Road Construction Project Completion in Selected Counties in Kenya. Journal of Entrepreneurship and Project Management. 2026;11(7):1-24. doi:10.47941/jepm.4120

BibTeX
@article{Mwendwa2026,
  author = {Mwendwa, Benjamin Muikiio and Kirinyet, Agnes},
  title = {Project Management Competency and Road Construction Project Completion in Selected Counties in Kenya},
  journal = {Journal of Entrepreneurship and Project Management},
  year = {2026},
  volume = {11},
  number = {7},
  pages = {1--24},
  doi = {10.47941/jepm.4120}
}
Kostenlos starten →