Response Time and Project Completion Time of Healthcare Sector Projects in Uasin Gishu County, Kenya
International Journal of Entrepreneurship and Project Management · 18.11.2026 · 11 (2) · 1-11
DOI: 10.47604/ijepm.4041 ↗Kurz gefasst
Fachartikel in der Zeitschrift International Journal of Entrepreneurship and Project Management, online erschienen am 18.11.2026. Verfasst von Sammy Kibiy und 1 weiteren Autor:innen. Die Arbeit nennt 27 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
Purpose
Delayed completion of healthcare projects limits the ability of hospitals to meet population demand. This study determined the influence of response time on project completion time of healthcare sector projects in Uasin Gishu County, Kenya. Methodology: The study used a correlational research design. A census of all 152 personnel involved in managing healthcare projects in public hospitals in the county was carried out, and 114 (75%) returned completed questionnaires. Data collection was carried out using a structured five-point Likert scale questionnaire, which was pre-tested and proved reliable (Cronbach's alpha for the response time was 0.76 and for project completion time 0.70). Data were analysed using descriptive statistics, Pearson's correlation and simple linear regression in SPSS version 26.
Findings
Respondents rated response time as moderately effective (mean = 3.34, SD = 0.74), while project completion time received a moderate rating (mean = 3.08, SD = 0.68). Prompt detection of project problems recorded the lowest mean score (mean = 3.01), suggesting that early identification of project-related challenges requires improvement. Correlation analysis established a moderate positive and statistically significant relationship between response time and project completion time (r = 0.48, p < .001). Similarly, regression analysis revealed that response time had a positive and statistically significant effect on project completion time (β = 0.48, t = 5.79, p < .001). The regression model explained approximately 23% of the variation in project completion time (R² = 0.23), indicating that response time was an important predictor, although other factors accounted for the remaining variation. Consequently, the null hypothesis was rejected, demonstrating that response time had a statistically significant effect on project completion time. Unique Contribution to Theory, Practice and Policy: The results support systems theory and contingency theory, since earlier detection and faster resolution of problems were associated with better schedule performance. Project teams should strengthen early problem detection and establish response routines that escalate problems within specified time frames, while the County Government should set response-time standards and include them in the monitoring and evaluation of healthcare projects.
Zitieren
APA
Kibiy, S., & Wanyoike, D. (2026). Response Time and Project Completion Time of Healthcare Sector Projects in Uasin Gishu County, Kenya. International Journal of Entrepreneurship and Project Management, 11(2), 1-11. https://doi.org/10.47604/ijepm.4041
Vancouver
Kibiy S, Wanyoike D. Response Time and Project Completion Time of Healthcare Sector Projects in Uasin Gishu County, Kenya. International Journal of Entrepreneurship and Project Management. 2026;11(2):1-11. doi:10.47604/ijepm.4041
BibTeX
@article{Kibiy2026,
author = {Kibiy, Sammy and Wanyoike, Daniel},
title = {Response Time and Project Completion Time of Healthcare Sector Projects in Uasin Gishu County, Kenya},
journal = {International Journal of Entrepreneurship and Project Management},
year = {2026},
volume = {11},
number = {2},
pages = {1--11},
doi = {10.47604/ijepm.4041}
}