Hubungan Penerapan K3 dengan Produktivitas Tenaga Kerja Konstruksi di Mojokerto dan Jombang

Aditya Firmansyah Ananda Putra, Nurul Rochmah, Mochammad Firmansyah

Jurnal Sains dan Teknologi (JSIT) · 17.11.2026 · 6 (3) · 891-903

DOI: 10.47233/jsit.v6i3.5424 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Jurnal Sains dan Teknologi (JSIT), online erschienen am 17.11.2026. Verfasst von Aditya Firmansyah Ananda Putra und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The implementation of occupational health and safety (OHS) must be examined in conjunction with labor productivity, using clear metrics. Evaluating such changes is essential to ensure that any design adjustments continue to meet technical requirements while providing a justifiable cost assessment. This study analyzes the relationship between OHS implementation and perceived productivity, and ranks OHS indicators for construction projects in Mojokerto and Jombang. A quantitative survey was conducted with 78 respondents from 20 companies, selected via purposive sampling. The research instrument included 12 OHS-related items and 13 productivity-related items, measured on a five-point Likert scale. Data analysis employed descriptive statistics, Pearson correlation, Cronbach’s alpha, assumption testing, and simple linear regression. The mean scores were 4.43 for OHS and 4.35 for productivity. The resulting model is Y = 12.702 + 0.829X, with R = 0.884, R² = 0.781, and t = 16.478 (p < 0.001). Among the individual indicators, "OHS banners" ranked first, with an R² of 0.429. A significant deviation from linearity limits the interpretation of the model. The findings indicate a positive relationship within the sample, warranting further investigation using objective productivity metrics. These results suggest that the redesign process is necessary not only to adapt channel dimensions to existing site conditions but also to ensure alignment between design drawings, as-built conditions, work quantities, and cost estimates. Consequently, the evaluation of redesigns can serve as a critical component in managing scope changes for drainage projects—particularly in locations where conflicts with existing facilities or structures arise. Furthermore, these evaluations can provide a basis for verification before design changes and cost estimates are finalized for implementation.

Zitieren

APA

Putra, A. F. A., Rochmah, N., & Firmansyah, M. (2026). Hubungan Penerapan K3 dengan Produktivitas Tenaga Kerja Konstruksi di Mojokerto dan Jombang. Jurnal Sains dan Teknologi (JSIT), 6(3), 891-903. https://doi.org/10.47233/jsit.v6i3.5424

Vancouver

Putra AFA, Rochmah N, Firmansyah M. Hubungan Penerapan K3 dengan Produktivitas Tenaga Kerja Konstruksi di Mojokerto dan Jombang. Jurnal Sains dan Teknologi (JSIT). 2026;6(3):891-903. doi:10.47233/jsit.v6i3.5424

BibTeX
@article{Putra2026,
  author = {Putra, Aditya Firmansyah Ananda and Rochmah, Nurul and Firmansyah, Mochammad},
  title = {Hubungan Penerapan K3 dengan Produktivitas Tenaga Kerja Konstruksi di Mojokerto dan Jombang},
  journal = {Jurnal Sains dan Teknologi (JSIT)},
  year = {2026},
  volume = {6},
  number = {3},
  pages = {891--903},
  doi = {10.47233/jsit.v6i3.5424}
}
Kostenlos starten →