Alternatif Penggantian Metode Kerja Precast dengan Cast in Situ pada Proyek Saluran
Jurnal Sains dan Teknologi (JSIT) · 16.11.2026 · 6 (3) · 874-884
DOI: 10.47233/jsit.v6i3.5420 ↗Kurz gefasst
Fachartikel in der Zeitschrift Jurnal Sains dan Teknologi (JSIT), online erschienen am 16.11.2026. Verfasst von Fahrezy Damaryanto und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
The drainage improvement project on Jalan Kedurus Dukuh I and X, Surabaya, experienced changes in dimensions and construction methods due to the existing pump house drainage conditions. These conditions indicate the importance of adjusting the design based on actual field conditions so that changes in dimensions and construction methods can be evaluated technically and economically. This study aims to develop redesign drawings for Sections A, B, and C based on the initial design and as-built conditions, and to compare the realized construction costs with the costs resulting from the redesign. The study employed an evaluative case study approach through a review of DED documents, as-built drawings, MC-100, RAB, redesign drawings, and supporting data. Item costs were calculated by multiplying quantities by the unit prices in the workbook, while new items without comparable prices were calculated using AHSP 2025. The redesign restored the reference cross-section of the U-Ditch in Section A to 120 × 120 cm and proposed cast-in-situ construction at four conflict points. In Section B, a 120 × 150 cm U-Ditch with a 10-ton axle-load cover was applied at STA 0+000 and STA 0+025. In Section C, the outlet configuration was maintained with adjustments at the end section. The redesign cost was IDR 4,048,813,869.48, including 11% VAT, which was IDR 31,203.36 (0.00077%) lower than the cost based on MC-100. This total difference was not material and still requires verification of the cast-in-situ quantities and the equivalence of STA boundaries. The cost changes were mainly influenced by changes in the composition and quantities of drainage, earthwork, paving, and new work items, although the total redesign cost was relatively similar to the cost based on MC-100.
Zitieren
APA
Damaryanto, F., & Firmansyah, M. (2026). Alternatif Penggantian Metode Kerja Precast dengan Cast in Situ pada Proyek Saluran. Jurnal Sains dan Teknologi (JSIT), 6(3), 874-884. https://doi.org/10.47233/jsit.v6i3.5420
Vancouver
Damaryanto F, Firmansyah M. Alternatif Penggantian Metode Kerja Precast dengan Cast in Situ pada Proyek Saluran. Jurnal Sains dan Teknologi (JSIT). 2026;6(3):874-884. doi:10.47233/jsit.v6i3.5420
BibTeX
@article{Damaryanto2026,
author = {Damaryanto, Fahrezy and Firmansyah, Mochamad},
title = {Alternatif Penggantian Metode Kerja Precast dengan Cast in Situ pada Proyek Saluran},
journal = {Jurnal Sains dan Teknologi (JSIT)},
year = {2026},
volume = {6},
number = {3},
pages = {874--884},
doi = {10.47233/jsit.v6i3.5420}
}
EUVIMED