Evaluasi Schedule Proyek Menggunakan PDM dan PERT pada Proyek Pembangunan Gedung Dormitory UNAIR Kampus C

Adrian Setyo Nugroho, Hanie Teki Tjendani, Mochammad Firmansyah

Jurnal Sains dan Teknologi (JSIT) · 20.06.2026 · 6 (2) · 484-498

DOI: 10.47233/jsit.v6i2.4733 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Jurnal Sains dan Teknologi (JSIT), online erschienen am 20.06.2026. Verfasst von Adrian Setyo Nugroho und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Construction projects frequently experience delays due to scheduling inaccuracies and uncertainties in activity durations. In the Dormitory Building Construction Project of Universitas Airlangga Campus C, project delays occurred as a result of discrepancies between design drawings and actual site conditions, affecting the planned completion schedule. This study aims to evaluate project scheduling using the Precedence Diagram Method (PDM) and Program Evaluation and Review Technique (PERT), and to compare the duration estimates generated by both methods. The study utilized project scheduling data, activity dependency relationships, and duration data obtained from project documents and structured interviews. PDM analysis was conducted using Microsoft Project to identify the critical path and project duration. PERT analysis employed three time estimates, namely optimistic time (a), most likely time (m), and pessimistic time (b), to calculate expected time, variance, standard deviation, and project completion probability. The results indicate that the PDM method produces a project duration of 237 calendar days, while the PERT method generates an expected duration of 240 days. The 3-day difference indicates that PERT provides a more conservative estimate by considering uncertainty in activity durations. Furthermore, the probability analysis shows a project completion probability of 12.92%, indicating that activities on the critical path require stricter monitoring to minimize the risk of project delays.

Zitieren

APA

Nugroho, A. S., Tjendani, H. T., & Firmansyah, M. (2026). Evaluasi Schedule Proyek Menggunakan PDM dan PERT pada Proyek Pembangunan Gedung Dormitory UNAIR Kampus C. Jurnal Sains dan Teknologi (JSIT), 6(2), 484-498. https://doi.org/10.47233/jsit.v6i2.4733

Vancouver

Nugroho AS, Tjendani HT, Firmansyah M. Evaluasi Schedule Proyek Menggunakan PDM dan PERT pada Proyek Pembangunan Gedung Dormitory UNAIR Kampus C. Jurnal Sains dan Teknologi (JSIT). 2026;6(2):484-498. doi:10.47233/jsit.v6i2.4733

BibTeX
@article{Nugroho2026,
  author = {Nugroho, Adrian Setyo and Tjendani, Hanie Teki and Firmansyah, Mochammad},
  title = {Evaluasi Schedule Proyek Menggunakan PDM dan PERT pada Proyek Pembangunan Gedung Dormitory UNAIR Kampus C},
  journal = {Jurnal Sains dan Teknologi (JSIT)},
  year = {2026},
  volume = {6},
  number = {2},
  pages = {484--498},
  doi = {10.47233/jsit.v6i2.4733}
}
Kostenlos starten →