Analysis of Quantity Take Off Deviation Using BIM Method (Case Study of Construction of a Satpol PP Building)

Muhammad Reza Nur Fadlilah, Fajar Sri Handayani, Muji Rifai

Sustainable Civil Building Management and Engineering Journal · 2024

DOI: 10.47134/scbmej.v1i3.2828 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Sustainable Civil Building Management and Engineering Journal, 2024. Verfasst von Muhammad Reza Nur Fadlilah und 2 weiteren Autor:innen. Die Arbeit nennt 24 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Quantity Take Off (QTO) is in important process in the construction industry that calculates and estimates the amount of material needed to complete a construction project. This process includes detail analysis of design plans and technical specification to identify and calculate quantities. QTO results are used to create cost budgets, create project plans, and plan material procurement. This research explains the Building Information Modeling (BIM) application which uses Autodesk Revit software to calculate Quantity Take Off volume. The aim is to find out the difference between volume calculations using conventional methods and volume calculations using the BIM method and Quantity Take Off volumes in architectural work and structural work. A comparative analysis of conventional methods and the use of Autodesk Revit provide an overview of the efficiency and effectiveness of implementing BIM software in the Bantul Satpol PP Building Construction Project with a focus on structural an architectural work investigation studies. This research uses a case study methodology which includes a quantity survey using Building Information Modeling (BIM) techniques using Autodesk Revit and Microsoft Excel software. This research method includes preparatory steps, data collection techniques, 3D modeling, and data analysis based on volume the use of BIM software and conventional methods. Based on the survey results, the difference in volume calculations for architectural work is 9,68% and for structural work is 9,00%, this shows that volume calculations using the BIM method are smaller than using conventional methods.

Zitieren

APA

Fadlilah, M. R. N., Handayani, F. S., & Rifai, M. (2024). Analysis of Quantity Take Off Deviation Using BIM Method (Case Study of Construction of a Satpol PP Building). Sustainable Civil Building Management and Engineering Journal. https://doi.org/10.47134/scbmej.v1i3.2828

Vancouver

Fadlilah MRN, Handayani FS, Rifai M. Analysis of Quantity Take Off Deviation Using BIM Method (Case Study of Construction of a Satpol PP Building). Sustainable Civil Building Management and Engineering Journal. 2024. doi:10.47134/scbmej.v1i3.2828

BibTeX
@article{Fadlilah2024,
  author = {Fadlilah, Muhammad Reza Nur and Handayani, Fajar Sri and Rifai, Muji},
  title = {Analysis of Quantity Take Off Deviation Using BIM Method (Case Study of Construction of a Satpol PP Building)},
  journal = {Sustainable Civil Building Management and Engineering Journal},
  year = {2024},
  doi = {10.47134/scbmej.v1i3.2828}
}
Kostenlos starten →