Pengendalian Proyek dengan Metode Earned Value pada Pekerjaan Rehabilitasi Jaringan Irigasi Sumber Nangka Jember

Merlita Eriyanti, Totok Dwi Kuryanto, Amri Gunasti

Sustainable Civil Building Management and Engineering Journal · 2024

DOI: 10.47134/scbmej.v1i1.2151 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Sustainable Civil Building Management and Engineering Journal, 2024. Verfasst von Merlita Eriyanti und 2 weiteren Autor:innen. Die Arbeit nennt 28 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The rehabilitation of the D.I Sumber Nangka Irrigation Network takes 180 days or about 6 months to implement, with a budget of Rp. 4,077,964,693. In this study, the authors will analyze the data using the Earned Value method. Therefore, there is no shortage of research on the basic components of project work costs and the realization of completion of work in the field is not too late. The purpose of this research is to calculate the cost of BCWS, BCWP, and ACWP. The results of the D.I Sumber Nangka Irrigation Network Rehabilitation study, Kec. Ledokombo was completed in the 24th week with a total cost of Rp. 4,077,964,693. in the 1st week to the 24th week the fee used is Rp. 3,702,175,554.

Zitieren

APA

Eriyanti, M., Kuryanto, T. D., & Gunasti, A. (2024). Pengendalian Proyek dengan Metode Earned Value pada Pekerjaan Rehabilitasi Jaringan Irigasi Sumber Nangka Jember. Sustainable Civil Building Management and Engineering Journal. https://doi.org/10.47134/scbmej.v1i1.2151

Vancouver

Eriyanti M, Kuryanto TD, Gunasti A. Pengendalian Proyek dengan Metode Earned Value pada Pekerjaan Rehabilitasi Jaringan Irigasi Sumber Nangka Jember. Sustainable Civil Building Management and Engineering Journal. 2024. doi:10.47134/scbmej.v1i1.2151

BibTeX
@article{Eriyanti2024,
  author = {Eriyanti, Merlita and Kuryanto, Totok Dwi and Gunasti, Amri},
  title = {Pengendalian Proyek dengan Metode Earned Value pada Pekerjaan Rehabilitasi Jaringan Irigasi Sumber Nangka Jember},
  journal = {Sustainable Civil Building Management and Engineering Journal},
  year = {2024},
  doi = {10.47134/scbmej.v1i1.2151}
}
Kostenlos starten →