Standarisasi Kinerja Waktu dan Biaya dengan Metode Earned Value pada Tahap Pekerjaan Struktur Proyek

Andre Agitiya Wahyu, Amri Gunasti, Ilanka Cahya Dewi

Sustainable Civil Building Management and Engineering Journal · 2024

DOI: 10.47134/scbmej.v1i1.2138 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Sustainable Civil Building Management and Engineering Journal, 2024. Verfasst von Andre Agitiya Wahyu und 2 weiteren Autor:innen. Die Arbeit nennt 21 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The Jember Millennium Home Center Project experienced delays, because there was a difference between the costs that should have been spent not in accordance with the scheduled work performance and the difference here is negative. Therefore, research on cost index analysis and schedule performance index on the Jember Millennium Home Center project has no shortage of costs and the realization of completion work in the field is late. The purpose of this research is to calculate CPI and SPI. The method used in this research is Earned Value Analysis. The results showed that the Schedule Variant (SV) had a negative value of -Rp.30,940,091.57. While the value (CV) for 15 weeks has a positive value of Rp. 16,779,031.46, - from the difference in BCWP fees of Rp. 47,719,123 and ACWP Rp. 30,940,091, - means the project does not suffer losses.

Zitieren

APA

Wahyu, A. A., Gunasti, A., & Dewi, I. C. (2024). Standarisasi Kinerja Waktu dan Biaya dengan Metode Earned Value pada Tahap Pekerjaan Struktur Proyek. Sustainable Civil Building Management and Engineering Journal. https://doi.org/10.47134/scbmej.v1i1.2138

Vancouver

Wahyu AA, Gunasti A, Dewi IC. Standarisasi Kinerja Waktu dan Biaya dengan Metode Earned Value pada Tahap Pekerjaan Struktur Proyek. Sustainable Civil Building Management and Engineering Journal. 2024. doi:10.47134/scbmej.v1i1.2138

BibTeX
@article{Wahyu2024,
  author = {Wahyu, Andre Agitiya and Gunasti, Amri and Dewi, Ilanka Cahya},
  title = {Standarisasi Kinerja Waktu dan Biaya dengan Metode Earned Value pada Tahap Pekerjaan Struktur Proyek},
  journal = {Sustainable Civil Building Management and Engineering Journal},
  year = {2024},
  doi = {10.47134/scbmej.v1i1.2138}
}
Kostenlos starten →