Identifikasi Faktor-Faktor Keterlambatan pada Proyek Konstruksi Repetitif Menggunakan Pendekatan Systematic Literature Review
Journal of Sustainable Civil Engineering (JOSCE) · 28.05.2026 · 8 (01) · 17-36
DOI: 10.47080/josce.v8i01.4670 ↗Kurz gefasst
Systematische Übersicht in der Zeitschrift Journal of Sustainable Civil Engineering (JOSCE), online erschienen am 28.05.2026. Verfasst von Lando Tambunan und 3 weiteren Autor:innen.
Abstract (Originalsprache)
This study identifies and analyzes delay factors specifically in repetitive construction projects, such as roads, high-rise buildings, and housing. Using the Systematic Literature Review (SLR) method via Publish or Perish (Google Scholar, ResearchGate, ScienceDirect), an initial pool of 1,674 studies was filtered down through systematic identification, screening, and eligibility stages to a final sample of 100 accredited articles (2015–2024). Thematic analysis categorized 53 identified delay factors into six main groups , with contractor-related issues emerging as the most dominant contributor (17 factors). The top three individual factors are material and equipment impacts (43%), delayed progress payments by owners (40%), and ineffective planning and scheduling (37%). Managing contractor operations and maintaining stable owner cash flows are critical to mitigating these delays. This study provides a foundational framework for stakeholders to enhance project efficiency in repetitive construction.
Zitieren
APA
Tambunan, L., Aryanto, D., Gunarti, A. S. S., & Laksmi, A. A. (2026). Identifikasi Faktor-Faktor Keterlambatan pada Proyek Konstruksi Repetitif Menggunakan Pendekatan Systematic Literature Review. Journal of Sustainable Civil Engineering (JOSCE), 8(01), 17-36. https://doi.org/10.47080/josce.v8i01.4670
Vancouver
Tambunan L, Aryanto D, Gunarti ASS, Laksmi AA. Identifikasi Faktor-Faktor Keterlambatan pada Proyek Konstruksi Repetitif Menggunakan Pendekatan Systematic Literature Review. Journal of Sustainable Civil Engineering (JOSCE). 2026;8(01):17-36. doi:10.47080/josce.v8i01.4670
BibTeX
@article{Tambunan2026,
author = {Tambunan, Lando and Aryanto, Defri and Gunarti, Anita Setyowati Srie and Laksmi, Anasya Arsita},
title = {Identifikasi Faktor-Faktor Keterlambatan pada Proyek Konstruksi Repetitif Menggunakan Pendekatan Systematic Literature Review},
journal = {Journal of Sustainable Civil Engineering (JOSCE)},
year = {2026},
volume = {8},
number = {01},
pages = {17--36},
doi = {10.47080/josce.v8i01.4670}
}
EUVIMED