Load to Failure Testing of the Jose Reyes Configuration (JRC) Technique for Arthroscopic Quadriceps Tendon Repair
Journal of Orthopaedic Science and Research · 29.06.2026 · 7 (2) · 1-5
DOI: 10.46889/josr.2026.7211 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of Orthopaedic Science and Research, online erschienen am 29.06.2026. Verfasst von Wesson Pious A Espiritu und 3 weiteren Autor:innen. Die Arbeit nennt 15 Literaturangaben.
Abstract (Originalsprache)
Background
Espiritu et al. previously described the Jose Reyes Configuration (JRC) technique as a reduced-implant arthroscopic quadriceps tendon repair utilizing two transosseous tunnels and a single central knotless anchor. Although the technique offers theoretical advantages including lower implant burden, reduced patellar bone violation and potential cost savings, objective mechanical data remain unavailable.
Objective
To perform preliminary time-zero mechanical validation of the JRC construct using standardized tensile testing.
Methods
A pilot biomechanical feasibility study was performed using a fresh beef quadriceps tendon surrogate model. The JRC construct was reproduced according to the previously published technique. Testing was conducted using a Micro Universal Testing Machine (100 kN capacity; sensitivity 0.01) at a constant crosshead speed of 10 mm/min until failure. Peak load to failure and failure mode were recorded.
Results
The construct tolerated progressive loading to a peak force of 1250.29 N (1.25 kN; 281.08 lbf). Failure occurred through tendon tissue cut-through without suture rupture or hardware disengagement.
Conclusion
Preliminary testing demonstrated encouraging immediate fixation strength of the JRC construct. Failure at the tissue interface rather than hardware suggests robust fixation characteristics. Further repeated-sample, cyclic, comparative and clinical studies are warranted.
Zitieren
APA
Espiritu, W. P. A., Ngo, R. J. Y., Virola, C. A. T., & Barroga, C. I. F. (2026). Load to Failure Testing of the Jose Reyes Configuration (JRC) Technique for Arthroscopic Quadriceps Tendon Repair. Journal of Orthopaedic Science and Research, 7(2), 1-5. https://doi.org/10.46889/josr.2026.7211
Vancouver
Espiritu WPA, Ngo RJY, Virola CAT, Barroga CIF. Load to Failure Testing of the Jose Reyes Configuration (JRC) Technique for Arthroscopic Quadriceps Tendon Repair. Journal of Orthopaedic Science and Research. 2026;7(2):1-5. doi:10.46889/josr.2026.7211
BibTeX
@article{Espiritu2026,
author = {Espiritu, Wesson Pious A and Ngo, Ryan Jasper Y and Virola, Carl Arvi T and Barroga, Chester Ian F},
title = {Load to Failure Testing of the Jose Reyes Configuration (JRC) Technique for Arthroscopic Quadriceps Tendon Repair},
journal = {Journal of Orthopaedic Science and Research},
year = {2026},
volume = {7},
number = {2},
pages = {1--5},
doi = {10.46889/josr.2026.7211}
}
EUVIMED