EUVIMEDEUVIMED entdecken
Open Access · CC BY-NC-ND 4.0

A case study comparing the results of a copper open-pit mine scheduling considering two different approaches for spatial interpolation of comminution geometallurgical variables

Sílvia Martins, Pedro Campos, Douglas Mazzinghy

Journal of Sustainable Mining · 30.09.2025 · 24 (4)

DOI: 10.46873/2300-3960.1470 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Sustainable Mining, online erschienen am 30.09.2025. Verfasst von Sílvia Martins und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-ND 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The use of geometallurgical variables to improve the accuracy obtained in mine planning is an increasingly present reality in mining. However, the way these variables are interpolated to construct the block model is still a major challenge since they are non-additive variables. In this case study, a database from a copper mine located in Brazil was used to compare mining planning by Direct Block Scheduling using two spatial interpolation approaches. In the first approach, the geometallurgy block model was produced interpolating the comminution indexes Axb and BWI from the drill holes, and the specific energy was calculated at each block. The second approach consisted of calculating the specific energy at the drill holes first, then interpolating the values into the blocks. The results indicated that the difference between the two approaches was not significant. Both block models produced a mine life equal to seven years and a percentage difference in the accumulated NPV of 0.54%.

Zitieren

APA

Martins, S., Campos, P., & Mazzinghy, D. (2025). A case study comparing the results of a copper open-pit mine scheduling considering two different approaches for spatial interpolation of comminution geometallurgical variables. Journal of Sustainable Mining, 24(4). https://doi.org/10.46873/2300-3960.1470

Vancouver

Martins S, Campos P, Mazzinghy D. A case study comparing the results of a copper open-pit mine scheduling considering two different approaches for spatial interpolation of comminution geometallurgical variables. Journal of Sustainable Mining. 2025;24(4). doi:10.46873/2300-3960.1470

BibTeX
@article{Martins2025,
  author = {Martins, Sílvia and Campos, Pedro and Mazzinghy, Douglas},
  title = {A case study comparing the results of a copper open-pit mine scheduling considering two different approaches for spatial interpolation of comminution geometallurgical variables},
  journal = {Journal of Sustainable Mining},
  year = {2025},
  volume = {24},
  number = {4},
  doi = {10.46873/2300-3960.1470}
}
Kostenlos starten →