Risk Analysis of Delayed Departure of Cement Trucks and Proposed Improvements Using Fishbone Diagram and FMEA
International Journal of Science, Technology & Management · 11.11.2026 · 7 (6) · 725-734
DOI: 10.46729/ijstm.v7i6.1517 ↗Kurz gefasst
Fachartikel in der Zeitschrift International Journal of Science, Technology & Management, online erschienen am 11.11.2026. Verfasst von Mohamad Lubabul Khadik und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-SA 4.0).
Abstract (Originalsprache)
Delays in truck departures can disrupt distribution processes and affect a company’s operational targets. This study aims to identify the causes of cement truck departure delays on the Rembang route at PT Semen Indonesia Logistik and to determine improvement priorities using a Fishbone Diagram and Failure Mode and Effects Analysis (FMEA). A descriptive approach with qualitative and quantitative analysis was applied, using operational departure data for May–July 2026, observations, and assessments by two experts. Of 265 departures, 41 were delayed (15.5%). The Fishbone Diagram grouped the causes into five categories: Man, Method/Environment, Machine, Operational, and Administration. The FMEA showed that receiving warehouse stock constraints (level stock) had the highest Risk Priority Number (RPN) of 392 (S = 8, O = 7, D = 7), followed by prolonged parking time (378) and vehicle breakdowns (RSK) (270). Level stock and prolonged parking were the main improvement priorities, together accounting for 32 of 41 delays (78%), while vehicle breakdowns remain under monitoring because of their highest severity.
Zitieren
APA
Khadik, M. L., Priyana, E. D., & Purwanto (2026). Risk Analysis of Delayed Departure of Cement Trucks and Proposed Improvements Using Fishbone Diagram and FMEA. International Journal of Science, Technology & Management, 7(6), 725-734. https://doi.org/10.46729/ijstm.v7i6.1517
Vancouver
Khadik ML, Priyana ED, Purwanto. Risk Analysis of Delayed Departure of Cement Trucks and Proposed Improvements Using Fishbone Diagram and FMEA. International Journal of Science, Technology & Management. 2026;7(6):725-734. doi:10.46729/ijstm.v7i6.1517
BibTeX
@article{Khadik2026,
author = {Khadik, Mohamad Lubabul and Priyana, Efta Dhartika and Purwanto},
title = {Risk Analysis of Delayed Departure of Cement Trucks and Proposed Improvements Using Fishbone Diagram and FMEA},
journal = {International Journal of Science, Technology & Management},
year = {2026},
volume = {7},
number = {6},
pages = {725--734},
doi = {10.46729/ijstm.v7i6.1517}
}
EUVIMED