This study aims to optimize raw sugar unloading operations through the replacement of defective ship grab equipment. When the ship grab was not replaced, unloading operations required additional handling time because crane operators had to repeat lifting cycles due to grab leakage and incomplete closure. This condition caused part of the cargo to fall back into the vessel’s hold, reducing operational efficiency and prolonging unloading duration. As a result, crane operators were required to perform double handling to ensure that the grab was fully closed before each lifting cycle. The target unloading flow rate was 10,000 MT/day; however, due to ship grab malfunction, the achieved flow rate declined to approximately 8,000 MT/day. After replacing the defective ship grab with an available shore grab at the berth, unloading performance improved significantly, allowing the operation to exceed the planned target with an achieved flow rate of approximately 11,000 MT/day.

Zitieren

APA

Suryadi, A., Hidayatullah, R. N., & Putri, I. A. (2026). Optimization Of Raw Sugar Bulk Unloading Operations Under Handling Equipment Failure. Dinamika Bahari, 7(2), 159-166. https://doi.org/10.46484/db.v7i2n.1820

Vancouver

Suryadi A, Hidayatullah RN, Putri IA. Optimization Of Raw Sugar Bulk Unloading Operations Under Handling Equipment Failure. Dinamika Bahari. 2026;7(2):159-166. doi:10.46484/db.v7i2n.1820

BibTeX
@article{Suryadi2026,
  author = {Suryadi, Awel and Hidayatullah, Rizky Naufal and Putri, Indira Ari},
  title = {Optimization Of Raw Sugar Bulk Unloading Operations Under Handling Equipment Failure},
  journal = {Dinamika Bahari},
  year = {2026},
  volume = {7},
  number = {2},
  pages = {159--166},
  doi = {10.46484/db.v7i2n.1820}
}