Evaluation of the implementation of water resource management in western part of Kano River Irrigation Project (KRIP 1), Kano State, Nigeria
Ghana Journal of Geography · 26.08.2021 · 13 (2)
DOI: 10.4314/gjg.v13i2.12 ↗Kurz gefasst
Fachartikel in der Zeitschrift Ghana Journal of Geography, online erschienen am 26.08.2021. Verfasst von Sabo Malami und 3 weiteren Autor:innen.
Abstract (Originalsprache)
The aim of the research was to evaluate the implementation in Kano River Irrigation Project 1(KRIP 1). Cluster, Probability proportionate, availability and purposive sampling techniques were used for the selection of sectors, farmers, respondents and Hadejia Jama’are River Basin Development Authority (HJRBDA) staff respectively. Data were obtained through self-administered questionnaire, interview and field observation. The analysis was done using descriptive statistics. Results of the study showed that the proposed aerial extent of KRIP 1 was 22,000 ha but only 77.27% was implemented. Result also revealed that the amount of water released to the project site from Ruwankanya Reservoir (3.2m) and upstream water head (0.20m) were higher than the design and was attributed to siltation in the dam. Canal design implementation was achieved to about 94%. Result further indicated that although wheat, vegetable, tomato and guinea corn were identified as the project crops specified in the design, currently, farmers cultivate rice, maize, tomato and onion in order of importance. It is recommended that water monitoring, evaluation and legal unit should be established by the HJRBDA to checkmate farmers’ deviation from the specified design of the project and vandalisation of canals and waterways.
Zitieren
APA
Malami, S., Rilwanu, T. Y., Tanko, A. I., & Adamu, G. K. (2021). Evaluation of the implementation of water resource management in western part of Kano River Irrigation Project (KRIP 1), Kano State, Nigeria. Ghana Journal of Geography, 13(2). https://doi.org/10.4314/gjg.v13i2.12
Vancouver
Malami S, Rilwanu TY, Tanko AI, Adamu GK. Evaluation of the implementation of water resource management in western part of Kano River Irrigation Project (KRIP 1), Kano State, Nigeria. Ghana Journal of Geography. 2021;13(2). doi:10.4314/gjg.v13i2.12
BibTeX
@article{Malami2021,
author = {Malami, Sabo and Rilwanu, Tasi’u Yalwa and Tanko, Adamu Idris and Adamu, Garba K/Na’isa},
title = {Evaluation of the implementation of water resource management in western part of Kano River Irrigation Project (KRIP 1), Kano State, Nigeria},
journal = {Ghana Journal of Geography},
year = {2021},
volume = {13},
number = {2},
doi = {10.4314/gjg.v13i2.12}
}
EUVIMED