EUVIMEDEUVIMED entdecken
Crossref

Using an Assembly Sequencing Application to React to a Production Constraint: a Case Study

Yakov Fradkin, Michel Cordonnier, Andrew Henry, David Newton

SAE International Journal of Materials and Manufacturing · 28.03.2017 · 10 (3) · 316-319

DOI: 10.4271/2017-01-0242 ↗

Kurz gefasst

Fachartikel in der Zeitschrift SAE International Journal of Materials and Manufacturing, online erschienen am 28.03.2017. Verfasst von Yakov Fradkin und 3 weiteren Autor:innen. Die Arbeit wurde bisher 1-mal zitiert (Crossref) und nennt 7 Literaturangaben.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Ford Motor Company’s assembly plants build vehicles in a certain sequence. The planned sequence for the plant’s trim and final assembly area is developed centrally and is sent to the plant several days in advance. In this work we present the study of two cases where the plant changes the planned sequence to cope with production constraints. In one case, a plant pulls ahead two-tone orders that require two passes through the paint shop. This is further complicated by presence in the body shop area of a unidirectional rotating tool that allows efficient build of a sequence “A-B-C” but heavily penalizes a sequence “C-B-A”. The plant changes the original planned sequence in the body shop area to the one that satisfies both pull-ahead and rotating tool requirements. In the other case, a plant runs on lean inventories. Material consumption is tightly controlled down to the hour to match with planned material deliveries. When an inevitable delay of receipt of inbound shipment of a particular part is expected, the plant must somehow react to alleviate that part’s shortage and avoid assembly line stoppage. The plant reacts by changing the originally planned assembly sequence to the one that slows down the rate of installation of that part until the receipt of shipment from a supplier; afterwards, the plant accelerates the rate of installation of that part. We’ll briefly discuss the sequencing application that allows a plant to react to the ever changing production environment.

Zitieren

APA

Fradkin, Y., Cordonnier, M., Henry, A., & Newton, D. (2017). Using an Assembly Sequencing Application to React to a Production Constraint: a Case Study. SAE International Journal of Materials and Manufacturing, 10(3), 316-319. https://doi.org/10.4271/2017-01-0242

Vancouver

Fradkin Y, Cordonnier M, Henry A, Newton D. Using an Assembly Sequencing Application to React to a Production Constraint: a Case Study. SAE International Journal of Materials and Manufacturing. 2017;10(3):316-319. doi:10.4271/2017-01-0242

BibTeX
@article{Fradkin2017,
  author = {Fradkin, Yakov and Cordonnier, Michel and Henry, Andrew and Newton, David},
  title = {Using an Assembly Sequencing Application to React to a Production Constraint: a Case Study},
  journal = {SAE International Journal of Materials and Manufacturing},
  year = {2017},
  volume = {10},
  number = {3},
  pages = {316--319},
  doi = {10.4271/2017-01-0242}
}
Kostenlos starten →