Evaluating operationalisation of integrated monitoring and evaluation system in Kisumu County: Implications for policy makers
African Evaluation Journal · 20.06.2019 · 7 (1)
DOI: 10.4102/aej.v7i1.385 ↗Kurz gefasst
Fachartikel in der Zeitschrift African Evaluation Journal, online erschienen am 20.06.2019. Verfasst von Enock Warinda. Die Arbeit wurde bisher 4-mal zitiert (Crossref) und nennt 55 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
Background
Evaluation findings are increasingly becoming valuable for policy makers in Kenya. The Directorate of Monitoring and Evaluation is responsible for providing reliable data findings for decision-makers. They are in turn expected to access the data and information through the National Integrated Monitoring and Evaluation System (NIMES). Unfortunately, the directorate hardly receives timely data as required, thus is unable to make timely decision within the ministry of agriculture, livestock and irrigation in Kisumu County.
Objectives
The aim of this study was to assess the extent of operationalisation of NIMES through utilisation of the electronic project management information system (e-ProMIS) within the three agricultural departments.
Methods
Through single-point face-to-face interviews using semi-structured questionnaires, mixed methods approach and Likert scale were applied to assess the level of operationalisation of, staff competences in, and satisfaction with NIMES. Both random and purposive sampling was used. Using mixed methods approach, primary and secondary data were collected from 10 key indicators and fitted in a binary logistic regression model to assess the level of operationalisation of NIMES.
Results
This article shows that operationalisation of NIMES is unsatisfactory, and data collected are incorrectly formatted. None of the departmental personnel charged with uploading relevant data in e-ProMIS neither accessed nor utilised the platform. There were no champions supporting NIMES, thus no reports generated from the system.
Conclusions
Factors hindering operationalisation of NIMES were: dysfunctional monitoring and evaluation (M&E) systems, limited human capacity on M&E, lack of NIMES champions, limited availability of data, unclear information flow to decision makers and inadequate integration of NIMES in planning and budgeting.
Zitieren
APA
Warinda, E. (2019). Evaluating operationalisation of integrated monitoring and evaluation system in Kisumu County: Implications for policy makers. African Evaluation Journal, 7(1). https://doi.org/10.4102/aej.v7i1.385
Vancouver
Warinda E. Evaluating operationalisation of integrated monitoring and evaluation system in Kisumu County: Implications for policy makers. African Evaluation Journal. 2019;7(1). doi:10.4102/aej.v7i1.385
BibTeX
@article{Warinda2019,
author = {Warinda, Enock},
title = {Evaluating operationalisation of integrated monitoring and evaluation system in Kisumu County: Implications for policy makers},
journal = {African Evaluation Journal},
year = {2019},
volume = {7},
number = {1},
doi = {10.4102/aej.v7i1.385}
}
EUVIMED