Why Industrialised Construction Fails to Scale: A Mechanism-Based Explanation of Strategic Lag in IBS and Modular Construction
Key Engineering Materials · 30.11.2026 · 1066 · 109-115
DOI: 10.4028/p-zs3usm ↗Kurz gefasst
Fachartikel in der Zeitschrift Key Engineering Materials, online erschienen am 30.11.2026. Verfasst von Cheow Syen Cheang und 2 weiteren Autor:innen. Die Arbeit nennt 20 Literaturangaben.
Abstract (Originalsprache)
Despite growing technical maturity, Industrialised Building Systems (IBS), modular construction and off-site production continue to scale unevenly. Existing studies typically attribute this to cost, regulation, supply chain fragmentation, skills, digital readiness and weak demand, but offer limited explanation of how these barriers interact to constrain scaling. This conceptual paper introduces strategic lag, defined as the misalignment between industrial capability and the value architecture required to organise, coordinate and monetise it. Drawing on industrialised construction, business model innovation, dynamic capabilities, platform and socio-technical literature, six mechanisms are identified: value-capture failure, coordination decoupling, platform incompleteness, governance misfit, digital disconnection and market translation gap. The framework reframes scaling failure as a capability–value architecture alignment problem rather than a collection of isolated adoption barriers. It proposes that scalable industrialised construction requires coordinated reconfiguration of business models, supply chains, platforms, governance, digital workflows and market value propositions. The framework provides propositions for future empirical testing and practical implications for firms and policymakers.
Zitieren
APA
Cheang, C. S., Woo, S. W., & Sia, M. K. (2026). Why Industrialised Construction Fails to Scale: A Mechanism-Based Explanation of Strategic Lag in IBS and Modular Construction. Key Engineering Materials, 1066, 109-115. https://doi.org/10.4028/p-zs3usm
Vancouver
Cheang CS, Woo SW, Sia MK. Why Industrialised Construction Fails to Scale: A Mechanism-Based Explanation of Strategic Lag in IBS and Modular Construction. Key Engineering Materials. 2026;1066:109-115. doi:10.4028/p-zs3usm
BibTeX
@article{Cheang2026,
author = {Cheang, Cheow Syen and Woo, Suk Wah and Sia, Mal Kong},
title = {Why Industrialised Construction Fails to Scale: A Mechanism-Based Explanation of Strategic Lag in IBS and Modular Construction},
journal = {Key Engineering Materials},
year = {2026},
volume = {1066},
pages = {109--115},
doi = {10.4028/p-zs3usm}
}
EUVIMED