Risk of Contract Growth and Opportunistic Behavior

Harald Brugaard Villmo, Tim Torvatn, Jan Terje Karlsen

International Journal of Risk and Contingency Management · 2012

DOI: 10.4018/ijrcm.2012070104 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal of Risk and Contingency Management, 2012. Verfasst von Harald Brugaard Villmo und 2 weiteren Autor:innen. Die Arbeit wurde bisher 4-mal zitiert (Crossref) und nennt 36 Literaturangaben.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This paper explores the risk associated with contract growth and opportunistic behavior in contractors with a special focus on the management of changes and interfaces. The study compares two successful megaprojects, the Gudrun oil platform by Statoil in the North Sea and the ATLAS detector at CERN. The empirical data were obtained using in-depth interviews with key personnel at Statoil and CERN. The study makes three significant contributions to knowledge: (1) megaprojects can benefit from having a high level of staffing since management costs are relatively small compared to construction costs; (2) when part of the end design is left to contractors, the contractors are given an opening to act in an opportunistic manner, which can cause contract growth; and (3) when a high level of integration is performed in-house, companies can take an extreme cost-driven approach to contracting.

Zitieren

APA

Villmo, H. B., Torvatn, T., & Karlsen, J. T. (2012). Risk of Contract Growth and Opportunistic Behavior. International Journal of Risk and Contingency Management. https://doi.org/10.4018/ijrcm.2012070104

Vancouver

Villmo HB, Torvatn T, Karlsen JT. Risk of Contract Growth and Opportunistic Behavior. International Journal of Risk and Contingency Management. 2012. doi:10.4018/ijrcm.2012070104

BibTeX
@article{Villmo2012,
  author = {Villmo, Harald Brugaard and Torvatn, Tim and Karlsen, Jan Terje},
  title = {Risk of Contract Growth and Opportunistic Behavior},
  journal = {International Journal of Risk and Contingency Management},
  year = {2012},
  doi = {10.4018/ijrcm.2012070104}
}
Kostenlos starten →