EUVIMEDEUVIMED entdecken
Open Access · CC BY 3.0

A Multi-Period Raw Material Preparation Scheduling Optimization Framework for Cigarette Manufacturing Integrating Safety Stock Constraints and Dispatc

Nan Yang

International Journal of Information Technologies and Systems Approach · 18.11.2026 · 19 (1) · 1-30

DOI: 10.4018/ijitsa.428014 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal of Information Technologies and Systems Approach, erschienen am 18.11.2026. Verfasst von Nan Yang. Die Arbeit nennt 22 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 3.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This paperstudied multi-period raw material preparation scheduling in cigarette manufacturing, where material availability, safety stock, warehouse capacity, and dispatch setup costs must be balanced. A mixed-integer optimization model was formulated with dispatch quantity, end-of-period inventory, and dispatch initiation as decision variables. The objective was to minimize inventory holding and fixed setup costs while satisfying constraints related to demand, safety stock, shared capacity, and integer handling. To solve the problem, the author proposed a feasibility-preserving multi-population integer evolutionary algorithm. The algorithm combines integer encoding, heuristic initialization, repair-first constraint handling, and elite migration to improve both feasibility and cost performance. Experiments on a benchmark example with 20 material grades and six periods showed that this algorithm reduces total cost from 159,500 CNY to 80,790 CNY compared with a fixed-batch heuristic.

Zitieren

APA

Yang, N. (2026). A Multi-Period Raw Material Preparation Scheduling Optimization Framework for Cigarette Manufacturing Integrating Safety Stock Constraints and Dispatc. International Journal of Information Technologies and Systems Approach, 19(1), 1-30. https://doi.org/10.4018/ijitsa.428014

Vancouver

Yang N. A Multi-Period Raw Material Preparation Scheduling Optimization Framework for Cigarette Manufacturing Integrating Safety Stock Constraints and Dispatc. International Journal of Information Technologies and Systems Approach. 2026;19(1):1-30. doi:10.4018/ijitsa.428014

BibTeX
@article{Yang2026,
  author = {Yang, Nan},
  title = {A Multi-Period Raw Material Preparation Scheduling Optimization Framework for Cigarette Manufacturing Integrating Safety Stock Constraints and Dispatc},
  journal = {International Journal of Information Technologies and Systems Approach},
  year = {2026},
  volume = {19},
  number = {1},
  pages = {1--30},
  doi = {10.4018/ijitsa.428014}
}
Kostenlos starten →