Solution algorithms for minimizing total weighted completion time scheduling with release times and time-dependent deterioration effects
Journal of Industrial and Management Optimization · 2026 · 22 (8) · 3968-3998
DOI: 10.3934/jimo.2026141 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of Industrial and Management Optimization, 2026. Verfasst von Li-Han Zhang und 4 weiteren Autor:innen. Die Arbeit nennt 68 Literaturangaben.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Zhang, L., Wang, X., Yin, N., Lv, Z., & Wang, J. (2026). Solution algorithms for minimizing total weighted completion time scheduling with release times and time-dependent deterioration effects. Journal of Industrial and Management Optimization, 22(8), 3968-3998. https://doi.org/10.3934/jimo.2026141
Vancouver
Zhang L, Wang X, Yin N, Lv Z, Wang J. Solution algorithms for minimizing total weighted completion time scheduling with release times and time-dependent deterioration effects. Journal of Industrial and Management Optimization. 2026;22(8):3968-3998. doi:10.3934/jimo.2026141
BibTeX
@article{Zhang2026,
author = {Zhang, Li-Han and Wang, Xiao-Yuan and Yin, Na and Lv, Zheng-Guo and Wang, Ji-Bo},
title = {Solution algorithms for minimizing total weighted completion time scheduling with release times and time-dependent deterioration effects},
journal = {Journal of Industrial and Management Optimization},
year = {2026},
volume = {22},
number = {8},
pages = {3968--3998},
doi = {10.3934/jimo.2026141}
}
EUVIMED