A digital twin-driven installation resource dynamic scheduling method of fully mechanized mining faces
Journal of Industrial and Management Optimization · 2026 · 22 (4) · 2070-2091
DOI: 10.3934/jimo.2026076 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of Industrial and Management Optimization, 2026. Verfasst von Yunrui Wang und 5 weiteren Autor:innen. Die Arbeit nennt 26 Literaturangaben.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Wang, Y., He, X., Wang, H., Sui, X., Yu, M., & Zheng, Z. (2026). A digital twin-driven installation resource dynamic scheduling method of fully mechanized mining faces. Journal of Industrial and Management Optimization, 22(4), 2070-2091. https://doi.org/10.3934/jimo.2026076
Vancouver
Wang Y, He X, Wang H, Sui X, Yu M, Zheng Z. A digital twin-driven installation resource dynamic scheduling method of fully mechanized mining faces. Journal of Industrial and Management Optimization. 2026;22(4):2070-2091. doi:10.3934/jimo.2026076
BibTeX
@article{Wang2026,
author = {Wang, Yunrui and He, Xi and Wang, Haoning and Sui, Xintong and Yu, Man and Zheng, Zhaoyang},
title = {A digital twin-driven installation resource dynamic scheduling method of fully mechanized mining faces},
journal = {Journal of Industrial and Management Optimization},
year = {2026},
volume = {22},
number = {4},
pages = {2070--2091},
doi = {10.3934/jimo.2026076}
}
EUVIMED