Topologically adaptive ant colony optimization for scheduling mega-structure pile foundations with endogenous spatio-temporal constraints
Journal of Civil Engineering and Management · 29.10.2026 · 32 (7) · 973-991
DOI: 10.3846/jcem.2026.28639 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of Civil Engineering and Management, online erschienen am 29.10.2026. Verfasst von Jingbo Hao und 6 weiteren Autor:innen. Die Arbeit nennt 30 Literaturangaben.
Abstract (Originalsprache)
Pile foundation scheduling of super-large engineering structure presents significant concerns and challenges due to the dynamically triggered and evolved vibration exclusion zones generated by impact boring. However, conventional resource-constrained project scheduling theories often exhibit spatial blindness, resulting in cascading construction critical path delays. Therefore, this study proposes a Topologically Adaptive Ant Colony Optimization (TA-ACO) algorithm embedded within a state-dependent simulation environment. The algorithm employs a dual-colony cooperative mechanism to effectively decouple the adversarial resource coupling between piling crews and grouting crews. Specifically, a novel look-ahead heuristic strategy is introduced, guiding crews to maximize spatial sparsity, which is analogous to solving the Maximum Independent Set problem and avoiding topological deadlocks. Computational experiments demonstrate that TA-ACO effectively mitigates spatial fragmentation and reduces the project makespan by 21.5% to 28.3% across different large-scale instances, compared to the industry-standard greedy strategy. The engineering application results of large airports show that the proposed algorithm compressed the construction period of a critical zone, which includes 97 pile foundations, from 47 days to 34 days, securing a valuable 13-day lead time for subsequent superstructure assembly.
Zitieren
APA
Hao, J., Zhang, M., Min, Q., Wang, R., Xiang, X., Han, L., & Li, M. (2026). Topologically adaptive ant colony optimization for scheduling mega-structure pile foundations with endogenous spatio-temporal constraints. Journal of Civil Engineering and Management, 32(7), 973-991. https://doi.org/10.3846/jcem.2026.28639
Vancouver
Hao J, Zhang M, Min Q, Wang R, Xiang X, Han L, et al. Topologically adaptive ant colony optimization for scheduling mega-structure pile foundations with endogenous spatio-temporal constraints. Journal of Civil Engineering and Management. 2026;32(7):973-991. doi:10.3846/jcem.2026.28639
BibTeX
@article{Hao2026,
author = {Hao, Jingbo and Zhang, Mengxi and Min, Qiaoling and Wang, Renchao and Xiang, Xuesong and Han, Libin and Li, Mingchao},
title = {Topologically adaptive ant colony optimization for scheduling mega-structure pile foundations with endogenous spatio-temporal constraints},
journal = {Journal of Civil Engineering and Management},
year = {2026},
volume = {32},
number = {7},
pages = {973--991},
doi = {10.3846/jcem.2026.28639}
}
EUVIMED