EUVIMEDEUVIMED entdecken
Crossref

Scheduling the production of prefabrication construction supply chains considering variable delivery times

Chung Ho, Zelda B. Zabinsky, Yong-Woo Kim

Journal of Civil Engineering and Management · 28.04.2026 · 32 (3) · 415-432

DOI: 10.3846/jcem.2026.26156 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Civil Engineering and Management, online erschienen am 28.04.2026. Verfasst von Chung Ho und 2 weiteren Autor:innen. Die Arbeit nennt 58 Literaturangaben.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The application of prefabrication and modularization in the construction industry has grown significantly recently. The efficiency of prefabrication supply chains yields substantial advantages for construction projects. A challenge is the variability in delivery times, which negatively impacts the economy and reliability of prefabrication supply chains. Most construction prefabrication suppliers have difficulty adjusting their schedules in response to delivery time changes in a timely manner. Despite this critical challenge, limited research has addressed proactive and robust production scheduling to mitigate these uncertainties. This study investigates a method for proactive and robust production scheduling for construction prefabrication suppliers, particularly those with multiple fabrication shops, responding to changes in delivery times. This paper introduces a multi-objective, two-stage stochastic programming model that facilitates the production planning with multiple fabrication shops, considering variable delivery times. Computational results from an experimental study demonstrate that the proposed optimization model achieves a 14.6% cost reduction compared to the traditional EDD method. Computational results also show that the expected cost of the stochastic programming model achieves a cost reduction of 0.23% compared to a deterministic model. These findings suggest the model’s capability to generate robust and flexible schedules that effectively balance cost minimization with time reduction.

Zitieren

APA

Ho, C., Zabinsky, Z. B., & Kim, Y. (2026). Scheduling the production of prefabrication construction supply chains considering variable delivery times. Journal of Civil Engineering and Management, 32(3), 415-432. https://doi.org/10.3846/jcem.2026.26156

Vancouver

Ho C, Zabinsky ZB, Kim Y. Scheduling the production of prefabrication construction supply chains considering variable delivery times. Journal of Civil Engineering and Management. 2026;32(3):415-432. doi:10.3846/jcem.2026.26156

BibTeX
@article{Ho2026,
  author = {Ho, Chung and Zabinsky, Zelda B. and Kim, Yong-Woo},
  title = {Scheduling the production of prefabrication construction supply chains considering variable delivery times},
  journal = {Journal of Civil Engineering and Management},
  year = {2026},
  volume = {32},
  number = {3},
  pages = {415--432},
  doi = {10.3846/jcem.2026.26156}
}
Kostenlos starten →