Prediction of cost contingency in construction projects by introducing machine learning algorithms

Acinia Nindartin, Sang-Jun Park, Kyung-Tae Lee, Ju-Hyung Kim, Susy Fatena Rostiyanti

Journal of Civil Engineering and Management · 13.11.2025 · 31 (8) · 860-880

DOI: 10.3846/jcem.2025.24913 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Civil Engineering and Management, online erschienen am 13.11.2025. Verfasst von Acinia Nindartin und 4 weiteren Autor:innen. Die Arbeit wurde bisher 10-mal zitiert (Crossref) und nennt 116 Literaturangaben.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Construction projects are bound by uncertainties and changes by its nature. Thus, cost contingency needs to be allocated to construction project budget to cope with any deviation of actual costs from planned ones. However, existing methods for predicting cost contingencies, as studied and practiced, still present limitations in reliability and accuracy. Machine learning (ML) has gained popularity for enhancing prediction power in various fields. The paper aims to examine various ML algorithms to implement a cost contingency prediction model, employing both continuous and categorical predictor variables. To develop the model, construction transportation project datasets, which were bid between 2013‒2017, were collected from the Florida Department of Transportation (FDOT) website. To address imbalanced regression dataset issues, the synthetic minority over-sampling technique for regression with Gaussian noise (SMOGN) algorithm is introduced. ML random forest (RF) regression associated with random search hyperparameter optimization, achieved remarkably accurate predictions compared to extreme gradient boosting (XGBoost) regression and artificial neural network (ANN) models. The results also demonstrate that four parameters are significant factors in predicting construction cost contingency: project amount, project duration, and latitude and longitude factors. These findings provide new insights for researchers in developing models and for practitioners seeking more advanced method.

Zitieren

APA

Nindartin, A., Park, S., Lee, K., Kim, J., & Rostiyanti, S. F. (2025). Prediction of cost contingency in construction projects by introducing machine learning algorithms. Journal of Civil Engineering and Management, 31(8), 860-880. https://doi.org/10.3846/jcem.2025.24913

Vancouver

Nindartin A, Park S, Lee K, Kim J, Rostiyanti SF. Prediction of cost contingency in construction projects by introducing machine learning algorithms. Journal of Civil Engineering and Management. 2025;31(8):860-880. doi:10.3846/jcem.2025.24913

BibTeX
@article{Nindartin2025,
  author = {Nindartin, Acinia and Park, Sang-Jun and Lee, Kyung-Tae and Kim, Ju-Hyung and Rostiyanti, Susy Fatena},
  title = {Prediction of cost contingency in construction projects by introducing machine learning algorithms},
  journal = {Journal of Civil Engineering and Management},
  year = {2025},
  volume = {31},
  number = {8},
  pages = {860--880},
  doi = {10.3846/jcem.2025.24913}
}
Kostenlos starten →