EUVIMEDEUVIMED entdecken
Crossref

Lean Maintenance at Ghana Gas: Employee Perceptions of Waste and Perceived Operational Outcomes

Emmanuel Oneistmous Ackon

International Journal of Scientific Research and Modern Technology · 16.11.2026 · 5 (10) · 168

DOI: 10.38124/ijsrmt.v5i10.1771 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal of Scientific Research and Modern Technology, online erschienen am 16.11.2026. Verfasst von Emmanuel Oneistmous Ackon. Die Arbeit nennt 21 Literaturangaben.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Lean maintenance seeks to improve asset performance while reducing waste. This study examines employee perceptions of maintenance waste, lean implementation factors and operational outcomes at Ghana National Gas Company Limited (Ghana Gas). A questionnaire survey of 73 employees assessed six waste items, nine implementation factors and five outcome items. Inventory management (M = 1.90) and waiting for maintenance resources (M = 1.95) received the strongest agreement among the waste items. Respondents strongly agreed with improved equipment availability (M = 1.63) and safety (M = 1.49), but disagreed with reduced maintenance costs (M = 4.10). Employee involvement (M = 1.05), supplier integration (M = 1.18), and customer alignment (M = 1.18) were rated very poor; management commitment (M = 1.86) was rated poor. The findings describe an uneven perceived outcome profile and support further investigation of participation, inventory practices and maintenance resource flow. All results are descriptive and perception-based. The study adds energy-sector evidence from sub-Saharan Africa, where empirical work on lean maintenance remains scarce.

Zitieren

APA

Ackon, E. O. (2026). Lean Maintenance at Ghana Gas: Employee Perceptions of Waste and Perceived Operational Outcomes. International Journal of Scientific Research and Modern Technology, 5(10), 168. https://doi.org/10.38124/ijsrmt.v5i10.1771

Vancouver

Ackon EO. Lean Maintenance at Ghana Gas: Employee Perceptions of Waste and Perceived Operational Outcomes. International Journal of Scientific Research and Modern Technology. 2026;5(10):168. doi:10.38124/ijsrmt.v5i10.1771

BibTeX
@article{Ackon2026,
  author = {Ackon, Emmanuel Oneistmous},
  title = {Lean Maintenance at Ghana Gas: Employee Perceptions of Waste and Perceived Operational Outcomes},
  journal = {International Journal of Scientific Research and Modern Technology},
  year = {2026},
  volume = {5},
  number = {10},
  pages = {168},
  doi = {10.38124/ijsrmt.v5i10.1771}
}
Kostenlos starten →