EUVIMEDEUVIMED entdecken
Crossref

Analysis of Consistency Between Cost Estimates and Project Schedule in Road Construction Projects in Palu City

Lailatul Mukarromah, Fahirah F., Adnan Fadjar

International Journal of Innovative Science and Research Technology · 23.11.2026 · 11 (11) · 1090

DOI: 10.38124/ijisrt/26nov655 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal of Innovative Science and Research Technology, online erschienen am 23.11.2026. Verfasst von Lailatul Mukarromah und 2 weiteren Autor:innen. Die Arbeit nennt 16 Literaturangaben.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This study examines the factors associated with implementation consistency and those potentially related to inconsistency in road construction projects in Palu City. Four groups of factors-technical, managerial, administrative/contractual, and external-were examined through two separate analytical models. A descriptive quantitative approach was applied to five road construction projects funded by the 2023 Regional Budget (APBD). Primary data were collected through questionnaires administered to 30 purposively selected respondents, comprising supervising consultants and relevant technical personnel from the Palu City Public Works Department.

Zitieren

APA

Mukarromah, L., F., F., & Fadjar, A. (2026). Analysis of Consistency Between Cost Estimates and Project Schedule in Road Construction Projects in Palu City. International Journal of Innovative Science and Research Technology, 11(11), 1090. https://doi.org/10.38124/ijisrt/26nov655

Vancouver

Mukarromah L, F. F, Fadjar A. Analysis of Consistency Between Cost Estimates and Project Schedule in Road Construction Projects in Palu City. International Journal of Innovative Science and Research Technology. 2026;11(11):1090. doi:10.38124/ijisrt/26nov655

BibTeX
@article{Mukarromah2026,
  author = {Mukarromah, Lailatul and F., Fahirah and Fadjar, Adnan},
  title = {Analysis of Consistency Between Cost Estimates and Project Schedule in Road Construction Projects in Palu City},
  journal = {International Journal of Innovative Science and Research Technology},
  year = {2026},
  volume = {11},
  number = {11},
  pages = {1090},
  doi = {10.38124/ijisrt/26nov655}
}
Kostenlos starten →