EUVIMEDEUVIMED entdecken
Crossref

Involuntary Resettlement in Hydro-power Project as a Part of Environmental Impact Assessment: A Case of Nepali Context

Bhakti P. D. Timsina

International Journal of Innovative Science and Research Technology · 16.07.2026 · 3509

DOI: 10.38124/ijisrt/26jun1419 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal of Innovative Science and Research Technology, online erschienen am 16.07.2026. Verfasst von Bhakti P. D. Timsina. Die Arbeit nennt 9 Literaturangaben.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The Environmental Impact Assessment (EIA) is a mandatory tool for large infrastructure projects including hydropower projects in Nepal and it has designed to assess the environmental and social impacts of a project which is comprehensive, covering various scientific disciplines and concerns, including those related to involuntary resettlement. However, the application of EIA in Nepal, especially concerning involuntary resettlement, has been a subject of discussion and analysis. The major objectives of this study are as follows: (I) An Overview of policies related on EIA and IR, (II) Find out the policy-gaps and (III) Provide the Valuable Way forwards for IR in Nepal.  Methods: Collect and review of several Acts, Rules and Regulations (Legal-Policy- Review). Similarly, Case Study and Comparatively Assessment as well as Empirical Assessment etc are the major methods for preparing the research Work.

Zitieren

APA

Timsina, B. P. D. (2026). Involuntary Resettlement in Hydro-power Project as a Part of Environmental Impact Assessment: A Case of Nepali Context. International Journal of Innovative Science and Research Technology, 3509. https://doi.org/10.38124/ijisrt/26jun1419

Vancouver

Timsina BPD. Involuntary Resettlement in Hydro-power Project as a Part of Environmental Impact Assessment: A Case of Nepali Context. International Journal of Innovative Science and Research Technology. 2026:3509. doi:10.38124/ijisrt/26jun1419

BibTeX
@article{Timsina2026,
  author = {Timsina, Bhakti P. D.},
  title = {Involuntary Resettlement in Hydro-power Project as a Part of Environmental Impact Assessment: A Case of Nepali Context},
  journal = {International Journal of Innovative Science and Research Technology},
  year = {2026},
  pages = {3509},
  doi = {10.38124/ijisrt/26jun1419}
}
Kostenlos starten →