Procedural Rationality in Large-Scale Research Infrastructure Construction Projects: A Comparative Case Study of the Pohang 4th-Generation Synchrotron and the Daejeon Rare Isotope Accelerator
The Journal of Convergence Society and Public Policy · 31.05.2026 · 20 (1) · 101-131
DOI: 10.37582/cspp.2026.20.1.101 ↗Kurz gefasst
Fachartikel in der Zeitschrift The Journal of Convergence Society and Public Policy, online erschienen am 31.05.2026. Verfasst von Ju-Sang Hong und 1 weiteren Autor:innen.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Hong, J., & Jin, S. (2026). Procedural Rationality in Large-Scale Research Infrastructure Construction Projects: A Comparative Case Study of the Pohang 4th-Generation Synchrotron and the Daejeon Rare Isotope Accelerator. The Journal of Convergence Society and Public Policy, 20(1), 101-131. https://doi.org/10.37582/cspp.2026.20.1.101
Vancouver
Hong J, Jin S. Procedural Rationality in Large-Scale Research Infrastructure Construction Projects: A Comparative Case Study of the Pohang 4th-Generation Synchrotron and the Daejeon Rare Isotope Accelerator. The Journal of Convergence Society and Public Policy. 2026;20(1):101-131. doi:10.37582/cspp.2026.20.1.101
BibTeX
@article{Hong2026,
author = {Hong, Ju-Sang and Jin, Sang-Hyeon},
title = {Procedural Rationality in Large-Scale Research Infrastructure Construction Projects: A Comparative Case Study of the Pohang 4th-Generation Synchrotron and the Daejeon Rare Isotope Accelerator},
journal = {The Journal of Convergence Society and Public Policy},
year = {2026},
volume = {20},
number = {1},
pages = {101--131},
doi = {10.37582/cspp.2026.20.1.101}
}
EUVIMED