EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Feasibility Assessment of a 5 MW Run-of-River Mini-Hydropower Plant on the Luswisi River at Bwenda Village, Ileje District, Tanzania

James James, Joel Mbwiga, Masoud Kamoleka

East African Journal of Engineering · 08.08.2026 · 9 (2) · 34-58

DOI: 10.37284/eaje.9.2.5513 ↗

Kurz gefasst

Fachartikel in der Zeitschrift East African Journal of Engineering, online erschienen am 08.08.2026. Verfasst von James James und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This study assesses the technical and screening-level economic feasibility of a 5 MW high-head run-of-river mini-hydropower plant on the Luswisi River at Bwenda Village, Ileje District, Tanzania. The revised paper integrates the topographic survey, HOMER Pro model configuration and outputs, and MATLAB/Simulink dynamic-simulation results that were omitted from the earlier manuscript. The site is located at approximately 9°20.1′S and 33°29.4′E. GIS-based catchment delineation and RTK-GNSS/total-station survey data identify the intake, waterway and powerhouse corridor and establish a gross head of 153 m; a preliminary 5% hydraulic-loss allowance gives a net head of 145.35 m. Corrected monthly discharge ranges from 3.70 to 7.10 m³/s. At 90% combined efficiency, 5 MW requires approximately 3.70 m³/s at gross head and 3.90 m³/s at the preliminary net head. The HOMER Pro hydro-grid model uses the corrected monthly flow vector, a 5 MW hydro unit, local AC demand, grid backup/export, a 25-year project life, an 8% discount rate, TZS 18 billion capital cost, TZS 2 billion lifetime operation and maintenance cost, and TZS 168/kWh electricity value. The corrected screening analysis gives 41,062 MWh/year saleable energy, an LCOE of about TZS 43.0/kWh, NPV of TZS 54.8 billion, IRR of 37.9%, and simple payback of 2.6 years. MATLAB/Simulink results show damped transient behaviour: frequency returns to approximately 50 Hz, rotor speed converges toward 1.0 pu, torque and active/reactive power remain bounded, balanced three-phase voltages are maintained, the local load is supplied, and surplus active power is transferred to the grid interface. These results support feasibility-level development of two 2.5 MW Pelton units, subject to multi-year gauging, detailed hydraulic and geotechnical design, environmental-flow allocation, manufacturer data and utility interconnection approval.

Zitieren

APA

James, J., Mbwiga, J., & Kamoleka, M. (2026). Feasibility Assessment of a 5 MW Run-of-River Mini-Hydropower Plant on the Luswisi River at Bwenda Village, Ileje District, Tanzania. East African Journal of Engineering, 9(2), 34-58. https://doi.org/10.37284/eaje.9.2.5513

Vancouver

James J, Mbwiga J, Kamoleka M. Feasibility Assessment of a 5 MW Run-of-River Mini-Hydropower Plant on the Luswisi River at Bwenda Village, Ileje District, Tanzania. East African Journal of Engineering. 2026;9(2):34-58. doi:10.37284/eaje.9.2.5513

BibTeX
@article{James2026,
  author = {James, James and Mbwiga, Joel and Kamoleka, Masoud},
  title = {Feasibility Assessment of a 5 MW Run-of-River Mini-Hydropower Plant on the Luswisi River at Bwenda Village, Ileje District, Tanzania},
  journal = {East African Journal of Engineering},
  year = {2026},
  volume = {9},
  number = {2},
  pages = {34--58},
  doi = {10.37284/eaje.9.2.5513}
}
Kostenlos starten →