Investigation of the Effectiveness of Construction Works Programming: A Case of Kiambu County Projects.

Peter Waweru Mburu, Abednego Oswald Gwaya, Stephen Onyango Diang’a

East African Journal of Engineering · 2021

DOI: 10.37284/eaje.3.1.417 ↗

Kurz gefasst

Fachartikel in der Zeitschrift East African Journal of Engineering, 2021. Verfasst von Peter Waweru Mburu und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The effective performance of any Construction Project to a large extent depends on how deliberate, well thought, planned and managed works programming is developed and implemented. Effective works programming helps those doing the project to make sure that it is done within scope, time and cost. This study adopted a case study design and simple random sampling technique to identify 102 respondents from a target population of 132 respondents. Descriptive and inferential statistical techniques were employed. The findings were; there was a strong correlation between the predictor variable on the dependent variable. The ANOVA analysis indicated a P-value of 0.000. Therefore, the prevalence of working program applicability, adherence to effective work programming and knowledge of work programming techniques had a significant impact on the effectiveness of construction projects delivery. The study rejected the null hypothesis that the prevalence of working program applicability did not affect the delivery of construction management projects and knowledge of work programming did not affect the delivery of construction management projects in Kiambu County. However, the study failed to reject the null hypothesis that adherence to work programming did not affect the delivery of construction management projects in Kiambu County. Therefore, the study concluded that the prevalence of working program applicability significantly affected the delivery of construction management projects in Kiambu County and knowledge of work programming significantly affected the delivery of construction management projects in Kiambu County. The primary focus of this study was injecting solutions through integrating technology to enhance efficiency in real-time monitoring and evaluation. With the model of planning, control, reporting and proactive remedial action for the performance of construction projects

Zitieren

APA

Mburu, P. W., Gwaya, A. O., & Diang’a, S. O. (2021). Investigation of the Effectiveness of Construction Works Programming: A Case of Kiambu County Projects. East African Journal of Engineering. https://doi.org/10.37284/eaje.3.1.417

Vancouver

Mburu PW, Gwaya AO, Diang’a SO. Investigation of the Effectiveness of Construction Works Programming: A Case of Kiambu County Projects. East African Journal of Engineering. 2021. doi:10.37284/eaje.3.1.417

BibTeX
@article{Mburu2021,
  author = {Mburu, Peter Waweru and Gwaya, Abednego Oswald and Diang’a, Stephen Onyango},
  title = {Investigation of the Effectiveness of Construction Works Programming: A Case of Kiambu County Projects},
  journal = {East African Journal of Engineering},
  year = {2021},
  doi = {10.37284/eaje.3.1.417}
}
Kostenlos starten →