Penjadwalan menggunakan Metode CPM dan Pendampingan Pengawasan Proyek Gedung Utama BPR Dana Nusantara Kota Batam
LANDMARK · 30.11.2024 · 2 (2) · 164-175
DOI: 10.37253/landmark.v2i2.10314 ↗Kurz gefasst
Fachartikel in der Zeitschrift LANDMARK, online erschienen am 30.11.2024. Verfasst von Azzhara Amanda und 1 weiteren Autor:innen.
Abstract (Originalsprache)
Project time management is one of the most crucial aspects of project management. The Critical Path Method (CPM) allows project managers to plan and control the project schedule by mapping all activities, estimating the duration of each activity, and determining the logistical sequence between activities. By knowing the critical path, managers can identify which activities should be completed before affecting the project completion date. This research aims to determine the workflow and critical path of the BPR Dana Nusantara Main Building project in Batam City, which PT is carrying out. Welcons Rekaprima Teknik will be the planner and PT. Tatamulia Nusantara Indah as implementing contractor. Using CPM, this project knows the critical path and estimates the project time to completion of 1190 days.
Zitieren
APA
Amanda, A., & Rifa'i, A. I. (2024). Penjadwalan menggunakan Metode CPM dan Pendampingan Pengawasan Proyek Gedung Utama BPR Dana Nusantara Kota Batam. LANDMARK, 2(2), 164-175. https://doi.org/10.37253/landmark.v2i2.10314
Vancouver
Amanda A, Rifa'i AI. Penjadwalan menggunakan Metode CPM dan Pendampingan Pengawasan Proyek Gedung Utama BPR Dana Nusantara Kota Batam. LANDMARK. 2024;2(2):164-175. doi:10.37253/landmark.v2i2.10314
BibTeX
@article{Amanda2024,
author = {Amanda, Azzhara and Rifa'i, Andri Irfan},
title = {Penjadwalan menggunakan Metode CPM dan Pendampingan Pengawasan Proyek Gedung Utama BPR Dana Nusantara Kota Batam},
journal = {LANDMARK},
year = {2024},
volume = {2},
number = {2},
pages = {164--175},
doi = {10.37253/landmark.v2i2.10314}
}
EUVIMED