THE CONSEQUENCES OF INSUFFICIENT STUDY OF A SITE OBTAINED BY DRAINING A SWAMPY AREA
Scientific Bulletin Series D : Mining, Mineral Processing, Non-Ferrous Metallurgy, Geology and Environmental Engineering · 2026 · 40 (1) · 31-41
DOI: 10.37193/sbsd.2026.1.03 ↗Kurz gefasst
Fachartikel in der Zeitschrift Scientific Bulletin Series D : Mining, Mineral Processing, Non-Ferrous Metallurgy, Geology and Environmental Engineering, 2026. Verfasst von CORNEL ARSENE. Die Arbeit nennt 8 Literaturangaben.
Abstract (Originalsprache)
Over time, people have sought to improve land affected by water accumulations and transform it into cultivable land, or even suitable for building construction. The behavior of a construction over time is greatly influenced by the nature of the foundation soil. In the case where the land on which the construction is to be located resulted from drainage and desiccation works of a marshy area, it is necessary to carry out geological and geotechnical studies, through which data on the nature of the foundation soil can be obtained. The design for the future construction will be based on the conclusions of these studies, and the proposed constructive solution and its implementation methods will have to take into account the situation on the ground and the way in which any risk factors identified by the studies carried out may have a disruptive influence on the functionality of the building in question. There are cases when, despite the fact that the adopted constructive solutions are consistent with the conclusions of the preliminary studies, due to inappropriate approaches in carrying out these studies, over time, deformations appear in the structure of the buildings, which affect their exploitation. This paper presents the situation of a production hall located on a land obtained by draining a marshy area and filling the resulting voids with waste from construction works, having a superficial layer of productive soil on the upper part. Later, part of the land was concessioned for the construction of the construction in question. After commissioning, the hall floor was affected by the appearance of areas with differentiated settlements, which led to the start of a monitoring program using geodetic methods. The information obtained showed not only that the process of differential settlement was not only manifested in the case of the floor, but also in the case of a number of thirteen columns in the resistance structure, but also highlighted a dependence between the settlement value per observation cycle and climatic conditions (humidity and temperature).
Zitieren
APA
ARSENE, C. (2026). THE CONSEQUENCES OF INSUFFICIENT STUDY OF A SITE OBTAINED BY DRAINING A SWAMPY AREA. Scientific Bulletin Series D : Mining, Mineral Processing, Non-Ferrous Metallurgy, Geology and Environmental Engineering, 40(1), 31-41. https://doi.org/10.37193/sbsd.2026.1.03
Vancouver
ARSENE C. THE CONSEQUENCES OF INSUFFICIENT STUDY OF A SITE OBTAINED BY DRAINING A SWAMPY AREA. Scientific Bulletin Series D : Mining, Mineral Processing, Non-Ferrous Metallurgy, Geology and Environmental Engineering. 2026;40(1):31-41. doi:10.37193/sbsd.2026.1.03
BibTeX
@article{ARSENE2026,
author = {ARSENE, CORNEL},
title = {THE CONSEQUENCES OF INSUFFICIENT STUDY OF A SITE OBTAINED BY DRAINING A SWAMPY AREA},
journal = {Scientific Bulletin Series D : Mining, Mineral Processing, Non-Ferrous Metallurgy, Geology and Environmental Engineering},
year = {2026},
volume = {40},
number = {1},
pages = {31--41},
doi = {10.37193/sbsd.2026.1.03}
}