EUVIMEDEUVIMED entdecken
Open Access · CC BY-SA 4.0

Penentuan Komponen Kritis untuk Track Shoe Assy Excavator T200 Menggunakan Metode Analytical Hierarchy Process (AHP) di PT XYZ

Aksyal Abi Maulana, Winarno Winarno, Wahyudin Wahyudin, Yamandito Mario Nugroho

Industrika : Jurnal Ilmiah Teknik Industri · 27.10.2026 · 10 (4) · 1041-1052

DOI: 10.37090/emt48w17 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Industrika : Jurnal Ilmiah Teknik Industri, online erschienen am 27.10.2026. Verfasst von Aksyal Abi Maulana und 3 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

At PT XYZ, the mismatch between Procurement lead time and continuously changing production demand increases the risk of material Procurement delays, which may disrupt the assembly process of the T200 Excavator Track Shoe Assy. This study aims to identify the most critical component that has the potential to cause production delays using the Analytical Hierarchy Process (AHP) method. The evaluation was conducted based on five criteria: Procurement lead time, annual demand, Procurement frequency, usage quantity, and cost. Data were obtained from the company’s internal information system and subjective assessments provided by three experienced Procurement staff. All data were systematically analyzed using AHP to determine the priority weight of each component. The results indicate that the nut component has the highest priority weight among all alternatives, making it the primary component requiring attention in the company’s Procurement planning and strategy. All pairwise comparison matrices achieved a Consistency Ratio below 0.1, indicating that the results are valid and consistent. This study provides a quantitative basis for supporting decision-making in developing an efficient and responsiveProcurement strategy under dynamic production demand. Keywords: AHP, Critical Component, Procurement, SCM

Zitieren

APA

Maulana, A. A., Winarno, W., Wahyudin, W., & Nugroho, Y. M. (2026). Penentuan Komponen Kritis untuk Track Shoe Assy Excavator T200 Menggunakan Metode Analytical Hierarchy Process (AHP) di PT XYZ. Industrika : Jurnal Ilmiah Teknik Industri, 10(4), 1041-1052. https://doi.org/10.37090/emt48w17

Vancouver

Maulana AA, Winarno W, Wahyudin W, Nugroho YM. Penentuan Komponen Kritis untuk Track Shoe Assy Excavator T200 Menggunakan Metode Analytical Hierarchy Process (AHP) di PT XYZ. Industrika : Jurnal Ilmiah Teknik Industri. 2026;10(4):1041-1052. doi:10.37090/emt48w17

BibTeX
@article{Maulana2026,
  author = {Maulana, Aksyal Abi and Winarno, Winarno and Wahyudin, Wahyudin and Nugroho, Yamandito Mario},
  title = {Penentuan Komponen Kritis untuk Track Shoe Assy Excavator T200 Menggunakan Metode Analytical Hierarchy Process (AHP) di PT XYZ},
  journal = {Industrika : Jurnal Ilmiah Teknik Industri},
  year = {2026},
  volume = {10},
  number = {4},
  pages = {1041--1052},
  doi = {10.37090/emt48w17}
}
Kostenlos starten →