Simulasi Penjadwalan Proyek Pembangunan Jembatan Gantung dengan Metode Monte Carlo
Jurnal Informasi & Teknologi · 05.06.2020 · 36-42
DOI: 10.37034/jidt.v2i1.34 ↗Kurz gefasst
Fachartikel in der Zeitschrift Jurnal Informasi & Teknologi, online erschienen am 05.06.2020. Verfasst von Julius Santony. Die Arbeit wurde bisher 1-mal zitiert (Crossref).
Abstract (Originalsprache)
The scheduling of a suspension bridge construction project is very influential in determining the success of construction which has risks and uncertainties in the construction of a suspension bridge. So we need a suspension bridge project scheduling to predict the work schedule for each suspension bridge construction activity. To overcome all the risks and uncertainties in the construction of a suspension bridge, a Monte Carlo method simulation is needed to process 10 activities in a suspension bridge construction project. The accuracy rate using Monte Carlo simulation is 93.99% for predictions for 2017, 2018 for 98.77% and 86.75% for 2019. So this Monte Carlo simulation can be used in predicting the scheduling of a suspension bridge construction project.
Zitieren
APA
Santony, J. (2020). Simulasi Penjadwalan Proyek Pembangunan Jembatan Gantung dengan Metode Monte Carlo. Jurnal Informasi & Teknologi, 36-42. https://doi.org/10.37034/jidt.v2i1.34
Vancouver
Santony J. Simulasi Penjadwalan Proyek Pembangunan Jembatan Gantung dengan Metode Monte Carlo. Jurnal Informasi & Teknologi. 2020:36-42. doi:10.37034/jidt.v2i1.34
BibTeX
@article{Santony2020,
author = {Santony, Julius},
title = {Simulasi Penjadwalan Proyek Pembangunan Jembatan Gantung dengan Metode Monte Carlo},
journal = {Jurnal Informasi & Teknologi},
year = {2020},
pages = {36--42},
doi = {10.37034/jidt.v2i1.34}
}
EUVIMED