EUVIMEDEUVIMED entdecken
Crossref

KICKS OCCURRING BEHIND THE CASING AFTER CEMENTING AND THEIR MITIGATION METHODS

Abusalam Mukhtarov Abusalam Mukhtarov, Nijat Safaraliyev Nijat Safaraliyev

ETM Equipment Technologies Materials · 21.04.2026 · 296

DOI: 10.36962/etm35042026-33 ↗

Kurz gefasst

Fachartikel in der Zeitschrift ETM Equipment Technologies Materials, online erschienen am 21.04.2026. Verfasst von Abusalam Mukhtarov Abusalam Mukhtarov und 1 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

After cementing, behind-casing kicks are one of the most serious signs that primary cement work is going wrong. They happen when gas gets through channels, micro-annuli, poorly displaced filter cake, or deformed surfaces, or when the fluid barrier breaks disseminates when the cement is setting. There may be annular gas movement, pressure transmission into deeper layers, or sustained casing pressure that stays high near the surface. This article depicts the main information related to the cause of post-cementing kicks as well as a useful approach to detect and handle them. One thing that gets a lot of attention is static gel strength (SGS), which is the main control point when the cement slurry commences to lose its ability to transfer hydrostatic pressure while still not having enough structure to stop gas from percolating. A long critical gel strength period, moderate fluid loss, and high amount of cuttings bed remained in the wellbore due to the low annular velocity can all be the cause of pressure build-up in the annulus, as shown by a case study from the South Caspian region. The results show that shortening the SGS transition window, improving mud rheology, utilization of gas blocking agents and using low-fluid-loss expanding cement to restore annular isolation diminishes the chances of kicks behind the casing. Keywords: behind-casing kick; cementing; gas migration; static gel strength; sustained casing pressure; micro-annulus; squeeze cementing; zonal isolation.

Zitieren

APA

Mukhtarov, A. M. A., & Safaraliyev, N. S. N. (2026). KICKS OCCURRING BEHIND THE CASING AFTER CEMENTING AND THEIR MITIGATION METHODS. ETM Equipment Technologies Materials, 296. https://doi.org/10.36962/etm35042026-33

Vancouver

Mukhtarov AMA, Safaraliyev NSN. KICKS OCCURRING BEHIND THE CASING AFTER CEMENTING AND THEIR MITIGATION METHODS. ETM Equipment Technologies Materials. 2026:296. doi:10.36962/etm35042026-33

BibTeX
@article{Mukhtarov2026,
  author = {Mukhtarov, Abusalam Mukhtarov Abusalam and Safaraliyev, Nijat Safaraliyev Nijat},
  title = {KICKS OCCURRING BEHIND THE CASING AFTER CEMENTING AND THEIR MITIGATION METHODS},
  journal = {ETM Equipment Technologies Materials},
  year = {2026},
  pages = {296},
  doi = {10.36962/etm35042026-33}
}
Kostenlos starten →