Stakeholders Involvement, Project Performance, and Service Delivery in Kenya's Water Flagship Projects: A Three-Construct System, Competing Structures, and Cross-Sectional Versus Temporal Coherence
Academic Journal of Interdisciplinary Studies · 07.11.2026 · 15 (6) · 64
DOI: 10.36941/ajis-2026-0153 ↗Kurz gefasst
Querschnittstudie in der Zeitschrift Academic Journal of Interdisciplinary Studies, online erschienen am 07.11.2026. Verfasst von Jonathan L. Meijo und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-NC 4.0).
Abstract (Originalsprache)
Stakeholder involvement, project performance, and service delivery are usually studied as links in a presumed causal chain, but their joint structure, the alternatives to the chain, and the agreement between project-level and portfolio-level evidence are rarely examined. This study analyzes the three constructs as a system in Kenya's water flagship projects.Survey data from 208 usable questionnaires (65.62% response; stratified sample of 317 of 1,804 projects) were analyzed with partial correlations, maximum-likelihood fit of competing three-variable structures with information criteria, Monte Carlo mediation, dominance and commonality analysis, a Gaussian conditional-independence graph for the four constructs including tendering strategy, and a comparison with recorded annual performance and service delivery indices (2015-2019; n = 5) using correlations, first differences, lags, gap series, and a domain cross-correlation matrix. With tendering strategy added, involvement became a leaf of the conditional-independence graph: its partial correlations with performance (-.031) and service delivery (-.014) were non-significant, and only its link to tendering (.451) survived. Project-level coherence did not simply reappear in time: the recorded composites correlated r = .784 over five years (95% CI -.32 to .98), but their year-to-year changes were negatively related (r = -.67; n = 4), service delivery overtook performance in 2018 (gap +8.4 points), and time and quality performance, not cost, tracked service delivery (r = .69 to .94 against -.01 to .43).The study provides the first system-level account of involvement, performance, and service delivery in Kenya's water flagship projects, shows which structural claims the data can and cannot support, and demonstrates that cross-sectional and temporal coherence are distinct and partly divergent, which cautions against using cross-sectional associations to forecast portfolio dynamics. Received: 13 September 2026 / Accepted: 29 October 2026 / Published: November 2026
Zitieren
APA
Meijo, J. L., Magutu, P. O., & Litondo, K. (2026). Stakeholders Involvement, Project Performance, and Service Delivery in Kenya's Water Flagship Projects: A Three-Construct System, Competing Structures, and Cross-Sectional Versus Temporal Coherence. Academic Journal of Interdisciplinary Studies, 15(6), 64. https://doi.org/10.36941/ajis-2026-0153
Vancouver
Meijo JL, Magutu PO, Litondo K. Stakeholders Involvement, Project Performance, and Service Delivery in Kenya's Water Flagship Projects: A Three-Construct System, Competing Structures, and Cross-Sectional Versus Temporal Coherence. Academic Journal of Interdisciplinary Studies. 2026;15(6):64. doi:10.36941/ajis-2026-0153
BibTeX
@article{Meijo2026,
author = {Meijo, Jonathan L. and Magutu, Peterson O. and Litondo, Kate},
title = {Stakeholders Involvement, Project Performance, and Service Delivery in Kenya's Water Flagship Projects: A Three-Construct System, Competing Structures, and Cross-Sectional Versus Temporal Coherence},
journal = {Academic Journal of Interdisciplinary Studies},
year = {2026},
volume = {15},
number = {6},
pages = {64},
doi = {10.36941/ajis-2026-0153}
}
EUVIMED