ANALISIS UMUR PROYEK DENGAN METODE PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) PADA PROYEK RENOVASI BANGUNAN MES DAN SARANA PENDUKUNG KANTOR BALAI PENGKAJIAN TEKNOLOGI PERTANIAN BALI

I Gede Ngurah Sunatha, Tjokorda Istri Praganingrum, Yohana Jusna

Jurnal Ilmiah Kurva Teknik · 2021

DOI: 10.36733/jikt.v10i1.2139 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Jurnal Ilmiah Kurva Teknik, 2021. Verfasst von I Gede Ngurah Sunatha und 2 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Office buildings listed into universal facilities buildings are one type of construction projects thatrequire a good project management to design, organize, perform and organize the construction project itself. Toachieve the success of the project needs to create a planning agenda that matches the wishes to be achieved. Ingeneral, project scheduling makes use of waku estimates of course. But the reality in the field of various obstaclesoccurred during the implementation of the project. therefore, researchers are trying to rescheduling theimplementation time of the Mess Building Renovation Project as well as supporting facilities of the BaliAgricultural Technology Assessment Office to recognize the maximum time of completion of the project. ProjectEvaluation and Review Technique (PERT) is one of the management tools in ensuring the scheduling of a projectby estimating the level of success. The pert procedure estimates 3 times is optimistic time, pessimistic time andvery maximum time. The level of accuracy estimated at the time of completion of the project is determined by thelevel of accuracy estimated the duration of each activity in the project. In analyzing calculations with the PERTmethod, an application-shaped tool, Microsoft Project, is used to manage projects. This application generallymakes it easier for users to create a work plan so that the implementation of the project can take place accordingto the agenda, mastering the influence of possible changes that occur, which can have an effect in the process ofproject implementation, financial scheduling and to unite businesses through communication and reporting ofproject data. Based on the results of the research that has been done, obtained optimistic project plan age of 128working days, the expected project plan age of 140 working days, the age of the pessimistic project plan of 153working days, and the optimum plan age (Te) of 141 working days.

Zitieren

APA

Sunatha, I. G. N., Praganingrum, T. I., & Jusna, Y. (2021). ANALISIS UMUR PROYEK DENGAN METODE PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) PADA PROYEK RENOVASI BANGUNAN MES DAN SARANA PENDUKUNG KANTOR BALAI PENGKAJIAN TEKNOLOGI PERTANIAN BALI. Jurnal Ilmiah Kurva Teknik. https://doi.org/10.36733/jikt.v10i1.2139

Vancouver

Sunatha IGN, Praganingrum TI, Jusna Y. ANALISIS UMUR PROYEK DENGAN METODE PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) PADA PROYEK RENOVASI BANGUNAN MES DAN SARANA PENDUKUNG KANTOR BALAI PENGKAJIAN TEKNOLOGI PERTANIAN BALI. Jurnal Ilmiah Kurva Teknik. 2021. doi:10.36733/jikt.v10i1.2139

BibTeX
@article{Sunatha2021,
  author = {Sunatha, I Gede Ngurah and Praganingrum, Tjokorda Istri and Jusna, Yohana},
  title = {ANALISIS UMUR PROYEK DENGAN METODE PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) PADA PROYEK RENOVASI BANGUNAN MES DAN SARANA PENDUKUNG KANTOR BALAI PENGKAJIAN TEKNOLOGI PERTANIAN BALI},
  journal = {Jurnal Ilmiah Kurva Teknik},
  year = {2021},
  doi = {10.36733/jikt.v10i1.2139}
}
Kostenlos starten →