PERENCANAAN STRUKTUR GEDUNG RUSUNAWA DI KABUPATEN SUKOHARJO DENGAN SISTEM RANGKA PEMIKUL MOMEN KHUSUS
Journal of Civil Engineering and Infrastructure Technology · 29.06.2026 · 5 (1) · 46-54
DOI: 10.36728/jceit.v5i1.6329 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of Civil Engineering and Infrastructure Technology, online erschienen am 29.06.2026. Verfasst von Harris Ian Masdhuki und 4 weiteren Autor:innen.
Abstract (Originalsprache)
The rapid population growth in the city of Sukoharjo and the increasing selling value of land, the construction of flats is the fulfillment of the need for housing. "Structure planning of the Eight-storey Rusunawa Building in Sukoharjo Regency aims to plan a high-rise building, which is strong against working loads. The structures reviewed include the upper structure and lower structure. The building structure uses (SRMPK) and shear walls. Calculation of the structural design of the roof slab support and pitch in the x and y direction Ø10 - 140 mm, reinforcement slab slab Ø12 - 170 mm, sloof 50/25 pedestal 4 D 13 mm, pitch 4 D 13 mm, shear Ø8 - 110 mm, main beam 60/30 bearing 6 D 22 mm, pitch 4 D 22 mm, shear Ø10 - 110 mm, joist 40/25 bearing 3 D 13 mm, pitch 3 D 13 mm, shear Ø10 - 110 mm, column 1 90/ 90 main 18 D 25, shear Ø12 - 200 mm, column 2 80/80 main 14 D 25 mm, shear Ø10 - 200 mm, wall shear 250 mm, borepile 70 cm, depth 20 m, studs 4 pieces, main 11 D 22 , shear Ø12 - 120 mm, pilecap 3.5 m/3.5 m, thickness 800 mm, x and y direction D 22 - 120 mm
Zitieren
APA
Masdhuki, H. I., Priyanto, K. J., Yuono, T., Sungkono, K. K. D., & Lee, C. S. (2026). PERENCANAAN STRUKTUR GEDUNG RUSUNAWA DI KABUPATEN SUKOHARJO DENGAN SISTEM RANGKA PEMIKUL MOMEN KHUSUS. Journal of Civil Engineering and Infrastructure Technology, 5(1), 46-54. https://doi.org/10.36728/jceit.v5i1.6329
Vancouver
Masdhuki HI, Priyanto KJ, Yuono T, Sungkono KKD, Lee CS. PERENCANAAN STRUKTUR GEDUNG RUSUNAWA DI KABUPATEN SUKOHARJO DENGAN SISTEM RANGKA PEMIKUL MOMEN KHUSUS. Journal of Civil Engineering and Infrastructure Technology. 2026;5(1):46-54. doi:10.36728/jceit.v5i1.6329
BibTeX
@article{Masdhuki2026,
author = {Masdhuki, Harris Ian and Priyanto, Kusdiman Joko and Yuono, Teguh and Sungkono, Kukuh Kurniawan Dwi and Lee, Chia Soi},
title = {PERENCANAAN STRUKTUR GEDUNG RUSUNAWA DI KABUPATEN SUKOHARJO DENGAN SISTEM RANGKA PEMIKUL MOMEN KHUSUS},
journal = {Journal of Civil Engineering and Infrastructure Technology},
year = {2026},
volume = {5},
number = {1},
pages = {46--54},
doi = {10.36728/jceit.v5i1.6329}
}
EUVIMED