Abstract (Originalsprache)

Scheduling methods are generally divided into several types of methods including, Beam Charts and S Curves, Network Diagrams and Linear Scheduling Methods (NGOs). the project did not suffer losses in terms of material, time, and others. The case study in this research is the Madang-Jarak Road Construction Project, Muara Must District, Tabalong Regency, South Kalimantan Province, which was previously planned to use the Barchat method / Beam Chart and S Curve with time planning 100 calendar days and a cost of Rp 6,809,461,168.91. The selection of this project is based on the consideration that this project is included in the work category where each item is carried out repeatedly and can use the Linear Scheduling Method (LSM) method. From the results of the analysis using the Linear Scheduling Method (NGO) shows the acceleration of the completion of the project development with 70 days, one month faster or 30 days with the previous planning which planned to finish in 100 calendar days, this is because the Linear Scheduling Method (NGO) method . using the grouping of work items that can be done simultaneously while in terms of costs, it costs Rp. 6,894,277,700.35, which is more expensive than the previous cost which costs Rp. 6,809,461,168.91. With a cost difference of Rp. 84,816,531.44, it is influenced by the number of workers used.

Zitieren

APA

Bhaskara, A., Maulana, F. M., & Masagala, A. M. (2021). ANALISIS PENJADWALAN WAKTU DAN BIAYA PROYEK DENGAN MENGGUNAKAN LINEAR SCHEDULING METHOD. Jurnal Teknik Sipil. https://doi.org/10.36448/jts.v12i2.2246

Vancouver

Bhaskara A, Maulana FM, Masagala AM. ANALISIS PENJADWALAN WAKTU DAN BIAYA PROYEK DENGAN MENGGUNAKAN LINEAR SCHEDULING METHOD. Jurnal Teknik Sipil. 2021. doi:10.36448/jts.v12i2.2246

BibTeX
@article{Bhaskara2021,
  author = {Bhaskara, Adwitya and Maulana, Fuad Muhammad and Masagala, Alfatsya Mubian},
  title = {ANALISIS PENJADWALAN WAKTU DAN BIAYA PROYEK DENGAN MENGGUNAKAN LINEAR SCHEDULING METHOD},
  journal = {Jurnal Teknik Sipil},
  year = {2021},
  doi = {10.36448/jts.v12i2.2246}
}
Kostenlos starten →