Analisis Tekno Ekonomi Rekonfigurasi Penyulang Walikukun 20 kV melalui Integrasi GI Ngawi dan GI Sragen

Fiqar Hanurcantyo, Zainal Arifin

Journal of Authentic Research · 19.11.2026 · 5 (4) · 7950-7967

DOI: 10.36312/jar.v5i4.6980 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Authentic Research, online erschienen am 19.11.2026. Verfasst von Fiqar Hanurcantyo und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Sistem distribusi tenaga listrik 20 kV pada penyulang Walikukun menghadapi permasalahan berupa penurunan tegangan dan tingginya rugi-rugi daya akibat panjang jaringan dan distribusi beban yang tidak optimal. Kondisi tersebut berpotensi menurunkan efisiensi sistem distribusi serta meningkatkan kehilangan energi. Penelitian ini bertujuan menganalisis kondisi eksisting jaringan 20 kV, mengevaluasi strategi rekonfigurasi jaringan melalui integrasi suplai Gardu Induk (GI) Ngawi dan GI Sragen, serta menganalisis kelayakan teknis dan ekonomi dari rekonfigurasi tersebut. Analisis teknis dilakukan menggunakan ETAP 21.0.1 dengan metode Newton-Raphson melalui simulasi aliran daya (load flow analysis). Analisis ekonomi dilakukan menggunakan pendekatan Life Cycle Cost (LCC), Net Present Value (NPV), Internal Rate of Return (IRR), Benefit Cost Ratio (BCR), dan Payback Period. Hasil simulasi kondisi awal menunjukkan tegangan pada Bus1177 sebesar 14,88 kV dengan penurunan tegangan sebesar 25,56%, sedangkan rugi-rugi daya penyulang mencapai 1.097 kW atau 20,93%. Rekonfigurasi dilakukan melalui pemecahan beban dan pengalihan sebagian beban ke GI Sragen menggunakan LBS Widodaren22. Setelah rekonfigurasi, tegangan Bus1177 meningkat menjadi 18,79 kV dengan penurunan tegangan 6,015%, sedangkan rugi-rugi daya turun menjadi 346 kW atau 6,6%, atau berkurang sebesar 751 kW (68,46%). Energi yang terselamatkan diperkirakan sebesar 3.483.129,45 kWh dengan nilai penghematan sebesar Rp2.650.661.514. Analisis ekonomi menunjukkan investasi sebesar Rp15.883.163.267, NPV sebesar Rp4.571.350.256, IRR 11,43%, BCR 1,28, dan Payback Period 7 tahun 5 bulan. Berdasarkan parameter yang digunakan, rekonfigurasi jaringan memberikan peningkatan kinerja teknis dan memenuhi kriteria kelayakan finansial yang digunakan dalam penelitian. The 20 kV electrical distribution system of the Walikukun feeder faces voltage drop and high power losses due to the long distribution network and suboptimal load allocation. These conditions may reduce distribution system efficiency and increase energy losses. This study aims to analyze the existing condition of the 20 kV distribution network, evaluate a network reconfiguration strategy through the integration of supply from the Ngawi and Sragen Substations, and assess the technical and economic feasibility of the proposed reconfiguration. The technical analysis was conducted using ETAP 21.0.1 with the Newton-Raphson method through load flow analysis. The economic analysis employed Life Cycle Cost (LCC), Net Present Value (NPV), Internal Rate of Return (IRR), Benefit Cost Ratio (BCR), and Payback Period approaches. The initial simulation results showed that the voltage at Bus1177 was 14.88 kV, corresponding to a voltage drop of 25.56%, while total feeder power losses reached 1,097 kW or 20.93%. The network reconfiguration was implemented through load splitting and the transfer of part of the load to the Sragen Substation using LBS Widodaren22. After reconfiguration, the voltage at Bus1177 increased to 18.79 kV, with the voltage drop decreasing to 6.015%. Total power losses decreased to 346 kW or 6.6%, representing a reduction of 751 kW (68.46%). The estimated energy saving reached 3,483,129.45 kWh, with an estimated saving value of IDR 2,650,661,514. The economic analysis resulted in an investment requirement of IDR 15,883,163,267, an NPV of IDR 4,571,350,256, an IRR of 11.43%, a BCR of 1.28, and a Payback Period of 7 years and 5 months. Based on the parameters applied in this study, the network reconfiguration improves the technical performance of the distribution system and meets the financial feasibility criteria applied in the analysis.

Zitieren

APA

Hanurcantyo, F., & Arifin, Z. (2026). Analisis Tekno Ekonomi Rekonfigurasi Penyulang Walikukun 20 kV melalui Integrasi GI Ngawi dan GI Sragen. Journal of Authentic Research, 5(4), 7950-7967. https://doi.org/10.36312/jar.v5i4.6980

Vancouver

Hanurcantyo F, Arifin Z. Analisis Tekno Ekonomi Rekonfigurasi Penyulang Walikukun 20 kV melalui Integrasi GI Ngawi dan GI Sragen. Journal of Authentic Research. 2026;5(4):7950-7967. doi:10.36312/jar.v5i4.6980

BibTeX
@article{Hanurcantyo2026,
  author = {Hanurcantyo, Fiqar and Arifin, Zainal},
  title = {Analisis Tekno Ekonomi Rekonfigurasi Penyulang Walikukun 20 kV melalui Integrasi GI Ngawi dan GI Sragen},
  journal = {Journal of Authentic Research},
  year = {2026},
  volume = {5},
  number = {4},
  pages = {7950--7967},
  doi = {10.36312/jar.v5i4.6980}
}