Reliability Improvement Process Case Study: PT HMS Tbk
Jurnal Bisnis dan Pemasaran Digital · 20.01.2024 · 3 (2) · 107-124
DOI: 10.35912/jbpd.v3i2.4512 ↗Kurz gefasst
Fachartikel in der Zeitschrift Jurnal Bisnis dan Pemasaran Digital, online erschienen am 20.01.2024. Verfasst von Sylvania Putri und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).
Abstract (Originalsprache)
Purpose
This study investigates the impact of unplanned and planned downtimes on PR (Production Reliability) performance in the tobacco industry, focusing on a company facing challenges due to COVID-19.
Method
A mixed-method approach is employed, combining quantitative data analysis of production lines (Q1 2024) with qualitative interviews. Root cause analysis (Current Reality Tree) and prioritization (Analytical Hierarchy Process) are used to identify and evaluate solutions.
Results
The research reveals maintenance focus on critical parts only and untested new materials as key contributors to low PR.
Conclusions
Improving Process Reliability at PT HMS requires a dual focus on minimizing unplanned disruptions through predictive maintenance and structured response strategies, while also optimizing planned maintenance to reduce its operational impact. Implementing a comprehensive maintenance framework and validating new materials through rigorous testing will ensure smoother production, fewer disruptions, and enhanced overall performance.
Limitations
The study focuses on one company during a specific timeframe. Contributions: This research proposes a framework for improving PR by recommending a comprehensive maintenance plan, thorough material testing, and an implementation plan based on the PDCA cycle. This is expected to lead to enhanced PR, reduced downtimes, and improved operational efficiency.
Zitieren
APA
Putri, S., & Utama, A. A. (2024). Reliability Improvement Process Case Study: PT HMS Tbk. Jurnal Bisnis dan Pemasaran Digital, 3(2), 107-124. https://doi.org/10.35912/jbpd.v3i2.4512
Vancouver
Putri S, Utama AA. Reliability Improvement Process Case Study: PT HMS Tbk. Jurnal Bisnis dan Pemasaran Digital. 2024;3(2):107-124. doi:10.35912/jbpd.v3i2.4512
BibTeX
@article{Putri2024,
author = {Putri, Sylvania and Utama, Akbar Adhi},
title = {Reliability Improvement Process Case Study: PT HMS Tbk},
journal = {Jurnal Bisnis dan Pemasaran Digital},
year = {2024},
volume = {3},
number = {2},
pages = {107--124},
doi = {10.35912/jbpd.v3i2.4512}
}
EUVIMED