EUVIMEDEUVIMED entdecken
Open Access · CC BY-SA 4.0

Reliability Improvement Process Case Study: PT HMS Tbk

Sylvania Putri, Akbar Adhi Utama

Jurnal Bisnis dan Pemasaran Digital · 20.01.2024 · 3 (2) · 107-124

DOI: 10.35912/jbpd.v3i2.4512 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Jurnal Bisnis dan Pemasaran Digital, online erschienen am 20.01.2024. Verfasst von Sylvania Putri und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Purpose

This study investigates the impact of unplanned and planned downtimes on PR (Production Reliability) performance in the tobacco industry, focusing on a company facing challenges due to COVID-19.

Method

A mixed-method approach is employed, combining quantitative data analysis of production lines (Q1 2024) with qualitative interviews. Root cause analysis (Current Reality Tree) and prioritization (Analytical Hierarchy Process) are used to identify and evaluate solutions.

Results

The research reveals maintenance focus on critical parts only and untested new materials as key contributors to low PR.

Conclusions

Improving Process Reliability at PT HMS requires a dual focus on minimizing unplanned disruptions through predictive maintenance and structured response strategies, while also optimizing planned maintenance to reduce its operational impact. Implementing a comprehensive maintenance framework and validating new materials through rigorous testing will ensure smoother production, fewer disruptions, and enhanced overall performance.

Limitations

The study focuses on one company during a specific timeframe. Contributions: This research proposes a framework for improving PR by recommending a comprehensive maintenance plan, thorough material testing, and an implementation plan based on the PDCA cycle. This is expected to lead to enhanced PR, reduced downtimes, and improved operational efficiency.

Zitieren

APA

Putri, S., & Utama, A. A. (2024). Reliability Improvement Process Case Study: PT HMS Tbk. Jurnal Bisnis dan Pemasaran Digital, 3(2), 107-124. https://doi.org/10.35912/jbpd.v3i2.4512

Vancouver

Putri S, Utama AA. Reliability Improvement Process Case Study: PT HMS Tbk. Jurnal Bisnis dan Pemasaran Digital. 2024;3(2):107-124. doi:10.35912/jbpd.v3i2.4512

BibTeX
@article{Putri2024,
  author = {Putri, Sylvania and Utama, Akbar Adhi},
  title = {Reliability Improvement Process Case Study: PT HMS Tbk},
  journal = {Jurnal Bisnis dan Pemasaran Digital},
  year = {2024},
  volume = {3},
  number = {2},
  pages = {107--124},
  doi = {10.35912/jbpd.v3i2.4512}
}
Kostenlos starten →