Energy-Efficient No-Idle Flowshop Scheduling Problem: A Comparative Analysis of the African Vultures Optimization Algorithm and Fire Hawk Optimizer
JKIE (Journal Knowledge Industrial Engineering) · 30.12.2025 · 12 (2) · 162-174
DOI: 10.35891/hh6e7q22 ↗Kurz gefasst
Fachartikel in der Zeitschrift JKIE (Journal Knowledge Industrial Engineering), online erschienen am 30.12.2025. Verfasst von Dana Marsetiya Utama. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).
Abstract (Originalsprache)
This study compares the African Vultures Optimization Algorithm (AVOA) and Fire Hawk Optimizer (FHO) for minimizing total energy consumption in the No-Idle Permutation Flowshop Scheduling Problem. The no-idle constraint requires continuous processing on each machine between its first and last operations, while standby periods can occur before and after this processing block. Four cases, ranging from 10 jobs on 6 machines to 100 jobs on 10 machines, were evaluated using population and iteration settings of 100 and 300. The comparison uses 30 reported outcomes per algorithm for each case. Descriptive statistics were recalculated, and two-sided Welch comparisons were used to explore differences in mean energy consumption. AVOA achieved lower mean values in Cases 2, 3, and 4, with relative reductions of 0.0321%, 0.0223%, and 0.0059%, respectively. FHO achieved a lower mean in Case 1, with a difference of 0.0022% and zero observed variation. These results support a case-dependent comparison rather than universal superiority. The differences in solution quality are small, and the available results do not establish computational efficiency, global optimality, or the causes of performance differences. The findings provide a basis for further evaluation using traceable benchmark instances, matched computational budgets, and validated energy units title, but neither the author’s name nor other identification designations, should appear on the abstract page. An abstract between 150-200 words and use 11 pt Times New Roman font with one space.
Zitieren
APA
Utama, D. M. (2025). Energy-Efficient No-Idle Flowshop Scheduling Problem: A Comparative Analysis of the African Vultures Optimization Algorithm and Fire Hawk Optimizer. JKIE (Journal Knowledge Industrial Engineering), 12(2), 162-174. https://doi.org/10.35891/hh6e7q22
Vancouver
Utama DM. Energy-Efficient No-Idle Flowshop Scheduling Problem: A Comparative Analysis of the African Vultures Optimization Algorithm and Fire Hawk Optimizer. JKIE (Journal Knowledge Industrial Engineering). 2025;12(2):162-174. doi:10.35891/hh6e7q22
BibTeX
@article{Utama2025,
author = {Utama, Dana Marsetiya},
title = {Energy-Efficient No-Idle Flowshop Scheduling Problem: A Comparative Analysis of the African Vultures Optimization Algorithm and Fire Hawk Optimizer},
journal = {JKIE (Journal Knowledge Industrial Engineering)},
year = {2025},
volume = {12},
number = {2},
pages = {162--174},
doi = {10.35891/hh6e7q22}
}
EUVIMED