Multi-period Co-optimization of Transmission and Wind Turbine Generation Expansion Planning with Short-circuit Constraints Under Deregulated Environment
Journal of Modern Power Systems and Clean Energy · 2026 · 14 (2) · 529-540
DOI: 10.35833/mpce.2025.000233 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of Modern Power Systems and Clean Energy, 2026. Verfasst von Hu Zhaoqin und 3 weiteren Autor:innen.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Zhaoqin, H., Yunpeng, X., Xiuli, W., & Xifan, W. (2026). Multi-period Co-optimization of Transmission and Wind Turbine Generation Expansion Planning with Short-circuit Constraints Under Deregulated Environment. Journal of Modern Power Systems and Clean Energy, 14(2), 529-540. https://doi.org/10.35833/mpce.2025.000233
Vancouver
Zhaoqin H, Yunpeng X, Xiuli W, Xifan W. Multi-period Co-optimization of Transmission and Wind Turbine Generation Expansion Planning with Short-circuit Constraints Under Deregulated Environment. Journal of Modern Power Systems and Clean Energy. 2026;14(2):529-540. doi:10.35833/mpce.2025.000233
BibTeX
@article{Zhaoqin2026,
author = {Zhaoqin, Hu and Yunpeng, Xiao and Xiuli, Wang and Xifan, Wang},
title = {Multi-period Co-optimization of Transmission and Wind Turbine Generation Expansion Planning with Short-circuit Constraints Under Deregulated Environment},
journal = {Journal of Modern Power Systems and Clean Energy},
year = {2026},
volume = {14},
number = {2},
pages = {529--540},
doi = {10.35833/mpce.2025.000233}
}
EUVIMED