The Analysis of Influential Factors on the Delay of Dredging Work at Rebaq Rinding River Line in Kutai Kertanegara Regency, Indonesia
Journal of Architecture and Civil Engineering · 2024
DOI: 10.35629/8193-09095470 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of Architecture and Civil Engineering, 2024. Verfasst von Deni Aswari und 2 weiteren Autor:innen.
Abstract (Originalsprache)
Along with fast progress of industrial world, particularly in the building construction project which also increasing rapidly, the difficulty level in managing and implementing construction projects also rising where the higher the difficulty the longer the time required to complete the project. A delay in work implementation is evident from the work package of Dredging Work Project for Rebaq Rinding River at Muara Muntai District of Kutai Kertanegara Regency. Thus, this research was performed to determine factors that influence project delays. The selected data analysis method was a factor analysis and multiple linear regression analysis from the questionnaire answers that distributed to 45 respondents ranging from the service users, contractors, and consultants involved in the Dredging Work Project in Rebaq Rinding River at Muara Muntai District of Kutai Kertanegara Regency which experienced delays. According to the result of this research, factor that has significant influence to project delays is factor of Work Implementation Method with value of tcount = 3.162 > from ttable = 2.028, and based on T test, it was found that the most dominant factor is the factor of Work Implementation Method with ß value = 0.646. The strategy used in dealing with project delays are: prior to the beginning of work implementation, implementation schedule must be prepared in accordance with the rational work stages and the work stages implementation must follow the planned method.
Zitieren
APA
Aswari, D., Mulyadi, L., & Wulandari, L. K. (2024). The Analysis of Influential Factors on the Delay of Dredging Work at Rebaq Rinding River Line in Kutai Kertanegara Regency, Indonesia. Journal of Architecture and Civil Engineering. https://doi.org/10.35629/8193-09095470
Vancouver
Aswari D, Mulyadi L, Wulandari LK. The Analysis of Influential Factors on the Delay of Dredging Work at Rebaq Rinding River Line in Kutai Kertanegara Regency, Indonesia. Journal of Architecture and Civil Engineering. 2024. doi:10.35629/8193-09095470
BibTeX
@article{Aswari2024,
author = {Aswari, Deni and Mulyadi, Lalu and Wulandari, Lies K.},
title = {The Analysis of Influential Factors on the Delay of Dredging Work at Rebaq Rinding River Line in Kutai Kertanegara Regency, Indonesia},
journal = {Journal of Architecture and Civil Engineering},
year = {2024},
doi = {10.35629/8193-09095470}
}
EUVIMED