Analysis of Implementation Delay in Road Construction Project (A Case Study of Road Improvement Project in Jayapura Regency)

Teo Pakabu, Nusa Sebayang, Lies K. Wulandari

Journal of Architecture and Civil Engineering · 2024

DOI: 10.35629/8193-09091928 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Architecture and Civil Engineering, 2024. Verfasst von Teo Pakabu und 2 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Planning and control over time and cost are important parts of overall construction project management. Work achievement of a project can be assessed through its quality, time, cost and safety aspects. So, in completing work project, time and cost incurred are aspects that must be continously measured for its deviation from the original plan. İn this study, time and cost deviations makes the management of road improvement project of Jayapura Regency getting worse. By employing several project performance indicators such as time and cost, it is possible to take preventative steps to make the road improvement project of Jayapura Regency can be proceed as planned. The research method applied in this research were qualitative and quantitative method where the qualitative method used a structured interview to respondents, while the quantity method involved a questionnaire distribution to total 100 respondents (10 project owners, 45 implementer contractors, and 45 consultants). Based on the result of this study, factors causing delays in the completion of road improvement project in Jayapura Regency are: (1) labor factor with value of 3.5400, (2) equipment factor with value of 3.4400, (3) finance factor with value of 3.4200, (4) material factor with factor of 3.3900, (5) scope of work and contract/work documents with value of 3.3900, (6) site characteristic factor with value of 3.3700, (7) changes factor with value of 3.3400, (8) managerial factor with value of 3.3300, (9) situation factor with value of 3.3200, (10) planning and scheduling factor with value of 3.2900, and (11) inspection, control and work evaluation systems with value of 3.2700. As for the ranking of variables causing delays for the completion of road improvement project in Jayapura Regency are: (a) workforce discipline with value of 3.5600, (b) inadequate number of workers or in accordane with the existing work activities with value of 3.5600 and (c) workforce nationalism with value of 3.5300

Zitieren

APA

Pakabu, T., Sebayang, N., & Wulandari, L. K. (2024). Analysis of Implementation Delay in Road Construction Project (A Case Study of Road Improvement Project in Jayapura Regency). Journal of Architecture and Civil Engineering. https://doi.org/10.35629/8193-09091928

Vancouver

Pakabu T, Sebayang N, Wulandari LK. Analysis of Implementation Delay in Road Construction Project (A Case Study of Road Improvement Project in Jayapura Regency). Journal of Architecture and Civil Engineering. 2024. doi:10.35629/8193-09091928

BibTeX
@article{Pakabu2024,
  author = {Pakabu, Teo and Sebayang, Nusa and Wulandari, Lies K.},
  title = {Analysis of Implementation Delay in Road Construction Project (A Case Study of Road Improvement Project in Jayapura Regency)},
  journal = {Journal of Architecture and Civil Engineering},
  year = {2024},
  doi = {10.35629/8193-09091928}
}
Kostenlos starten →